Laserfiche WebLink
Project File M&N#:8057-03 <br /> 28 October 2014 Site Visit Memorandum <br /> wr. <br /> H` <br /> �4 <br /> r d <br /> 4y,4 <br /> ,F <br /> Figure 4: Excavation of Existing Segment A Deadman <br /> At the time of the site visit Magnus Pacific had begun the excavation of the existing deadman along <br /> Segment A to start concrete coring for the new tieback anchors. Figure 4 shows the excavation from the <br /> west end of the site looking east. It can be seen that the excavated soil was placed between the <br /> deadman and the face of the existing bulkhead. <br /> 111lq 5 <br />