Laserfiche WebLink
Project File M&N#:8057-03 <br /> 28 October 2014 Site Visit Memorandum <br /> 1 <br /> _ iill�iii+ _31`O <br /> y r U <br /> L <br /> 0 <br /> v <br /> d <br /> a J' <br /> t <br /> r <br /> Figure 9: Excavation behind Existing Segment B Bulkhead to Relieve Soil Pressures <br /> The excavation behind the existing bulkhead is shown in Figure 9. It appeared that the removal of <br /> approximately 4 or 5 feet of soil was enough to reduce the deflection of the existing bulkhead.This <br /> alleviated concerns that the existing bulkhead would contact the new sheet piles. <br /> ,/„ 10 <br />