Laserfiche WebLink
Project File M&N#:8057-03 <br /> 28 October 2014 Site Visit Memorandum <br /> e <br /> L.. <br /> �I <br /> I11L{900CAIJI . <br /> Figure 8:Tension Cracks in the Soil behind the Existing Segment B Bulkhead <br /> During the site visit we discussed with the Contractor possible solutions to prevent the failing timber <br /> bulkhead from touching and loading the new sheet piles. The Contractor then decided on a plan of <br /> action and began excavating the soil behind the existing bulkhead to relieve the pressures and prevent <br /> further wall deflection. <br /> ,I„ 9 <br />