My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1018 14TH ST 2023-02-09
>
Address Records
>
14TH ST
>
1018
>
1018 14TH ST 2023-02-09
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/9/2023 1:07:39 PM
Creation date
5/17/2017 10:00:14 AM
Metadata
Fields
Template:
Address Document
Street Name
14TH ST
Street Number
1018
Notes
BULKHEAD PLATFORM GEOTECHNICAL REPORT INCLUDED
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
223
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SHANNON WILSON,INC. <br /> 4.4.3 Segment A Temporary Excavation Slope <br /> We performed a slope stability analysis of the proposed temporary excavation slope <br /> behind the Segment A bulkhead (associated with removal of contaminated soil)to determine <br /> feasible slope angles within the in situ soil. Based on our analysis, a slope flatter than 2.5H:1 V <br /> should be used to prevent shallow failures. If a slope steeper than 2.5H:1 V is used,the <br /> Contractor should be prepared for the slope to ravel back to a more stable slope. It should be <br /> noted that the Contractor should be made responsible for the selection of the final excavation <br /> slope based on their planned construction approach and worker safety. <br /> 4.5 Viewing Platform Foundation Design <br /> The proposed viewing platform is located in Segment A, near Station 0+00 (see Figure 2). We <br /> understand that the structure is intended for pedestrian use. Based on discussions with MNE,we <br /> understand that open-end steel pipe piles would likely be used to support the structure. <br /> We developed soil parameters for use by MNE in the axial capacity evaluation of the proposed <br /> piles. The ultimate axial capacity of a pile is a summation of the skin friction along the side of <br /> the pile and the end bearing at the tip of the pile. Table 2 provides ultimate unit skin friction and <br /> ultimate unit end bearing to estimate the axial resistance of the open-ended steel piles. The <br /> ultimate skin friction can be determined by multiplying the pile perimeter area by the ultimate <br /> unit skin friction. The ultimate end bearing can be determined by multiplying the pile end area <br /> by the ultimate unit end bearing. Because of the very dense nature of the glacial soils at the site, <br /> we anticipate that the open-end pipe piles will become plugged after penetrating about 5 to 10 <br /> feet into the very dense glacial soils below elevation -25 feet. Therefore, we recommend using <br /> the entire base area of the pile (e.g., 1.77 square feet for an 18-inch-diameter pile) in the <br /> calculation for ultimate end bearing. We recommend that a FS of 2.0 be applied to the ultimate <br /> values to obtain the allowable pile capacity. <br /> We understand that MNE will perform lateral resistance analyses of the piles for the viewing <br /> platform using the computer program LPILE'LUS. Recommended soil parameters for LPILEPLus <br /> are presented in Table 2. <br /> 5.0 CONSTRUCTION CONSIDERATIONS <br /> The applicability of the design parameters that are recommended in Section 4.0 is contingent <br /> upon good construction practice. Poor construction techniques and methods may alter conditions <br /> 21-1-21761-003-R 1 fdocx/wp/c,p 21-1-21761-003 <br /> 16 <br />
The URL can be used to link to this page
Your browser does not support the video tag.