Laserfiche WebLink
1 Schedule of Estimated City Project Costs for Breach and Related Work Within the <br /> 2 Smith Island-City Area <br /> 3 <br /> 4 All project costs listed below are estimated and will be adjusted to conform to the successful bidder's <br /> 5 proposal and all County expenditures invoiced to the City will be actual expenditures. <br /> Line Description of Bid Item Approx. Unit Unit Total <br /> # Quantity Cost Costs <br /> 1 Mobilization* 0.26 L.S. $266,100 $69,186 <br /> 2 Archaeological and Historical Salvage 5000 EST. $1 $5,000 <br /> 3 Removal Of Structures and Obstructions* 0.89 L.S. $92,000 $81,880 <br /> 4 Clearing and Grubbing-City 3.6 ACRE $4,000 $14,400 <br /> 5 Removal Of Man-Made Debris 10000 EST. $1 $10,000 <br /> 6 Removal Of Knotweed 263 SY $8 $2,104 <br /> 7 Roadway Excavation Incl. Haul-City 3625 CY $10 $36,250 <br /> 8 Dike Breach and Grading Incl.Haul-City 2925 CY $26 $76,050 <br /> 9 Channel Excavation Incl.Haul-City 14650 CY $20 $293,000 <br /> 10 Environmental Compliance Lead* 0.26 LS $27,500 $7,150 <br /> 11 Erosion/Water Pollution Control 15000 EST. $1 $15,000 <br /> 12 Floating Silt Curtain-City 1 LS $14,550 $14,550 <br /> 13 Cofferdam-City 1 LS $6,500 $6,500 <br /> 14 Type B Progress Schedule* 0.26 L.S. $10,000 $2,600 <br /> 15 SPCC Plan* 0.26 L.S. $4,000 $1,040 <br /> 16 Contractor Surveying* 0.26 L.S. $65,000 $16,900 <br /> 17 Health and Safety Plan* 0.26 L.S. $5,000 $1,300 <br /> 18 Temporary Access and Staging-City 1 LS $10,000 $10,000 <br /> Six Foot Chain Link Fence With 3-Strand 1950 LF $30 $58,500 <br /> 19 Barbed Wire Top-City <br /> Double 20 Foot Chain Link Gate With 3- 3 EACH $5,000 $15,000 <br /> 20 Strand Barbed Wire Top-City <br /> End, Gate, Corner,and Pull Post for Chain 12 EACH $250 $3,000 <br /> 21 Link Fence-City <br /> 22 Field Office Building 0.26 L.S. $8,000 $2,080 <br /> A Subtotal of Bid Items(Line 1 -Line 24) $741,490 <br /> B Sales Tax(9.2%of Line A) $68,217 <br /> C Subtotal of Bid Items and Sales Tax(Line A+Line B) $809,707 <br /> D Contingency(20%of Line C) $161,941 <br /> E Subtotal of Bid Items,Sales Tax, and Contingency(Line C+Line D) $971,648 <br /> F Construction Inspection&Contract Administration(18%of Line E) $174,897 <br /> G County Staff Administrative Cost Overhead(15%of Line F) $26,235 <br /> H Total Estimated Cost Of Breach and Related Work(Lines E-G) $1,172,780 <br /> 6 * Noted lump sum items with a quantity other than 1.0 represent the agreed split of costs for items <br /> 7 shared between the City and County. <br /> AMENDMENT NO.ONE TO THE INTERLOCAL AGREEMENT Page 9 of 9 <br /> FOR THE SMITH ISLAND RESTORATION PROJECT BY AND <br /> BETWEEN SNOHOMISH COUNTY AND THE CITY OF EVERETT <br />