Laserfiche WebLink
EXHIBIT B <br /> COMPENSATION <br /> LUMP SUM <br /> The City shall pay Service Provider Three Thousand Seven Hundred Fifty dollars($3,750.00)upon <br /> completion of the work, subject to the maximum stated in¶4(D)of this Agreement. <br /> A breakdown of the compensation is as follows: <br /> LUMP SUM COMPENSATION <br /> Hazardous Material Survey Services: <br /> Asbestos Survey&Sampling Analysis: $1,500.00 <br /> Lead Survey Sampling&Analysis: $ 750.00 <br /> Hazardous Chemicals Survey&Analysis: $ 500.00 <br /> Subtotal Engineering Services: $3,250.00 <br /> DESIGN CONTINGENCY FEE(IF REQUIRED) <br /> Additional Services that may be needed based upon any issues that surface during the design and construction <br /> of the project as approved only in writing and signed by an authorized City representative: <br /> TOTAL CONTINGENCY FEE $ 500.00 <br /> TOTAL FEE $3,750.00 <br />