My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2012/09/05 Council Agenda Packet
>
Council Agenda Packets
>
2012
>
2012/09/05 Council Agenda Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/19/2017 8:40:55 AM
Creation date
5/19/2017 8:40:06 AM
Metadata
Fields
Template:
Council Agenda Packet
Date
9/5/2012
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
168
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EVERETT CITY COUNCIL AGENDA ITEM COVER SHEET 14 <br /> PROJECT TITLE: <br /> Amendment No. 5 to Briefing COUNCIL BILL# <br /> Professional Services Proposed Action Originating Department Public Works <br /> Agreement with Murray, Smith Consent Contact Person David Voigt <br /> &Associates, Inc. for Sewer Action Phone Number 425-257-8983 <br /> Lift Station No. 24 First Reading FOR AGENDA OF 8/29/2012 <br /> Replacement Project Second Reading <br /> Third Reading <br /> Public Hearing <br /> Budget Advisory Initialed by: <br /> Department Head <br /> CAA • <br /> Council President 9,2 <br /> Location Preceding Action Attachments Department(s) Approval <br /> South Everett (not in Amendment No. 4 Amendment No. 5 Public Works, Legal <br /> City limits) July 24, 2012 <br /> Amount Budgeted $400,000 <br /> Expenditure Required $378,441 Account Number(s): UP 3313-5 <br /> Budget Remaining $21,559 <br /> Additional Required $0 <br /> DETAILED SUMMARY STATEMENT: <br /> Amendment No. 5 is for additional design performed and construction support services to be performed by <br /> Murray Smith Associates as described in the Scope of Work, Exhibit A-4: These professional engineering <br /> services are related to the Sewer Lift Station No. 24 replacement project. Some of the additional costs are <br /> also attributable to design modifications in response to the sewer pipe failure on Silver Way. <br /> Construction bids for the Lift Station No. 24 Replacement project were opened on June 6 and McClure& <br /> Sons was awarded the project. Construction is beginning this month and will continue through <br /> approximately September 2013. <br /> Amendment No. 5 increases the amount of the professional services agreement from$1,040,900 to <br /> $1,419,341. <br /> RECOMMENDATION (Exact action requested of Council): <br /> Authorize the Mayor to sign Amendment No. 5 to the Professional Services Agreement with Murray, Smith <br /> &.Associates,Inc. for Sewer Lift Station No. 24 Replacement Project for a total amount of$378,441. <br /> 121 <br />
The URL can be used to link to this page
Your browser does not support the video tag.