My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2012/10/17 Council Agenda Packet
>
Council Agenda Packets
>
2012
>
2012/10/17 Council Agenda Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/19/2017 9:57:21 AM
Creation date
5/19/2017 9:56:13 AM
Metadata
Fields
Template:
Council Agenda Packet
Date
10/17/2012
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
174
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Version 0913 <br /> 2 <br /> ERIK UTTER <br /> Broaccast gLioTent pgrade <br /> x- ibit A <br /> • <br /> Scope of Work <br /> This Exhibit A provides an overview of the services provided to complete this project as defined in the City of <br /> Everett's RFP for the Everett Channel Broadcast Equipment Upgrade. <br /> • <br /> Consulting <br /> Utter&Associates will provide the City of Everett consulting services in order to arrive at a detailed design of <br /> the new space.The proposal is based on the information provided by the RFP documents and face to face <br /> meetings. Consulting services includes space planning, system architecture and equipment selection. <br /> Consulting may also include discussions with alternative vendors to determine the best fit for all elements of <br /> the complete system. <br /> Design Services <br /> Preliminary designs need additional detail before they are ready for third party vendors and contractors. <br /> Electrical, mechanical and HVAC solutions need to be analyzed. These updates and modifications are <br /> included as part of this proposal. Third parties will produce final plans in accordance with the general <br /> direction from Utter&Associates. <br /> Project Management <br /> Coordination between all parties is critical to the success of such a high profile project. Utter&Associates <br /> will provide the project management function and oversee the entire project. We will work with the City of <br /> Everett and all other vendors to ensure success of the project. Specifically Utter&Associates will coordinate <br /> the installation to accommodate all stake holders. The new system will be installed in stages to minimize <br /> disruption and allow for continuos operation of the existing system. Utter&Associates will work with you to <br /> define an efficient cut-over process. <br /> Utter Associates • <br /> 1008 Western,Suite 201 t 206-829-8172 <br /> Seattle,WA 98104 1 e michael@utterassociates.com <br /> 17 <br />
The URL can be used to link to this page
Your browser does not support the video tag.