• <br /> 2. Submit a copy of either: 1)Letter of Concurrence from DAHP; or,2)the DAHP <br /> EZ-1 form,for DEPARTMENT coordination on compliance with Executive <br /> Order 05-05. <br /> 3. Submit a Pre-design report to the DEPARTMENT. <br /> 4. Submit final plans and specifications to the DEPARTMENT,which include the <br /> DEPARTMENT's Bid Specification Clauses Inserts,found at: <br /> http://www.ecy.wa.gov/programs/wq/funding/GrantLoanMgmtDocs/Eng/GrantLo <br /> anMgmtEngRes.html <br /> Task 3—Construction Management <br /> A. The RECIPIENT will provide construction oversight and management of the project. <br /> B. The RECIPIENT will submit a detailed construction quality assurance plan to the <br /> DEPARTMENT before the start of construction. This plan must describe how adequate <br /> and competent construction oversight will be performed. <br /> • <br /> C. The RECIPIENT will submit a construction schedule to the DEPARTMENT within 30 <br /> days of the start of construction. The construction schedule will be revised and/or <br /> updated whenever major changes occur and at a minimum of every three months. The <br /> RECIPIENT will submit the construction schedule to the DEPARTMENT with the <br /> quarterly report. When changes in the construction schedule affect previous cash flow <br /> estimates,revised cash flow projections must also be submitted to the DEPARTMENT. • <br /> D. Prior to execution,the RECIPIENT will submit eligible change orders that are a <br /> • significant deviation from the DEPARTMENT reviewed plans and specifications in <br /> writing for DEPARTMENT review and approval for payment.All other change orders <br /> must be approved by the DEPARTMENT for technical merit and should be submitted <br /> • within 30 days after execution. Change orders are to be signed by the contractor,the <br /> engineer(if appropriate), and the RECIPIENT prior to submittal to the DEPARTMENT <br /> for approval. <br /> E. Upon completion of construction,the RECIPIENT will provide to the DEPARTMENT's <br /> Project Manager a Stormwater Construction Completion Form signed by a professional <br /> engineer, indicating that the project was completed in accordance with the plans and <br /> specifications and major change orders approved by the DEPARTMENT's Project <br /> Eng'neer and shown on the Record Drawings.The Stormwater Construction Completion <br /> form can be found at: <br /> http://www.ecy.wa._Qov/programs/wq/funding/GrantLoanMamtDocs/Eng/GrantLoanMgmtEngRes.html <br /> Required Performance: <br /> 1. Submit the project construction quality assurance plan to the DEPARTMENT. <br /> 2. Submit the construction schedule to the DEPARTMENT. <br /> 3. Submit the signed and dated Declaration of Construction Completion Form to the <br /> DEPARTMENT. <br /> 7 <br /> -12. <br />