My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2012/12/18 Council Agenda Packet
>
Council Agenda Packets
>
2012
>
2012/12/18 Council Agenda Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/22/2017 9:05:56 AM
Creation date
5/22/2017 9:04:34 AM
Metadata
Fields
Template:
Council Agenda Packet
Date
12/18/2012
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
281
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
2 <br /> reduce odors to insubstantial levels at the property line. If the odors cannot be reduced to <br /> insubstantial levels,the planning director shall require the use to cease. <br /> 16. Landscaping <br /> Street frontage lesser of 10' or distance between building&lot line. <br /> 15' for parking abutting ROW <br /> private internal 10' of landscaping with street trees 30' on center. <br /> roadways. <br /> Side/rear lot lines 10' Type III <br /> Buildings 200 square feet of entry way landscaping is required for the business <br /> and visitor entrances to all principal buildings . <br /> Adjacent to Naval Landscaping shall be maintained to allow visibility of the required <br /> Station Everett and setback areas between 18 inches and 6 feet above grade. <br /> Port of Everett <br /> 17. Compatibility with Naval Station Everett <br /> a. Any development that is on a lot within 200 feet of Naval Station Everett or has frontage on <br /> the shoreline shall coordinate with Naval Station Everett on security and public safety issues. A <br /> comprehensive security and public safety plan must be submitted to the City at time of land use <br /> permit review. Naval Station Everett shall be provided at least 15 days to review and comment <br /> on the Plan. The Planning Director is authorized to establish conditions that address potential <br /> security impacts upon Naval Station Everett. <br /> b. Any business in the M-2 zoned portion of the Central Waterfront Planning area that generates <br /> electromagnetic radiation(EMR') shall coordinate with Naval Station Everett.An EMR <br /> Frequency Spectrum plan must be submitted to the City at time of land use permit review.Naval <br /> Station Everett shall be provided at least 15 days to review and comment on the Plan. The <br /> Planning Director is authorized to establish conditions that address potential EMR impacts to <br /> Naval Station Everett. <br /> c. Any development that generates marine traffic must coordinate with Naval Station Everett. A <br /> Port Operations Plan must be submitted to the City at time of land use permit review. Naval <br /> Station Everett shall be provided at least 15 days to review and comment on the Plan. The <br /> Planning Director is authorized to establish conditions that address potential impacts from <br /> Marine traffic on Naval Station Everett. <br /> d. All windows on north facing facades within 100 feet of Naval Station Everett shall be <br /> translucent(does not allow views to Naval Station Everett). <br /> 32 <br /> 65 <br />
The URL can be used to link to this page
Your browser does not support the video tag.