My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2105 GRAND AVE 2017-06-02
>
Address Records
>
GRAND AVE
>
2105
>
2105 GRAND AVE 2017-06-02
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/2/2017 1:31:16 PM
Creation date
5/24/2017 10:44:04 AM
Metadata
Fields
Template:
Address Document
Street Name
GRAND AVE
Street Number
2105
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
59
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Three Nail Designs <br /> Residential Drafting&Design <br /> 425-512-3090 <br /> August 22, 2013 <br /> Re: Gillum, 2105 Grand Ave. : BW 1307-003 <br /> Mr. Heilman, <br /> This is in response to your letter of 8/19. <br /> 1. A section view of the existing structure has been added to page 2. <br /> 2. The headers at the front windows must be a minimum 2x6. The newporch <br /> beam muct be a 4x8. I have noted this on page 7, and have included the beam calcs. <br /> 3. Shearwall schedule is on the "S" pages following 10. <br /> 4. "S" pages have been included following page 10. <br /> 5. The basement was and will remain unfinished, this was an error due to a <br /> software upgrade referencing an option that we discarded. All work to be done has <br /> been clouded and noted as such. <br /> 6. Water proof deck detail has been added to page 8 and railing details on page <br /> 10 have been referenced on page 8. <br /> 7. All code references have been updated to 2012 IRC and WSEC. <br /> 8. Smoke alarms have been added to pages 6, 7, & 8 and referenced to be <br /> installed per R314. <br /> 9. Carbon monoxide alarms have been added to pages 6, 7, & 8 and referenced <br /> to be installed per R315. <br /> 10. The post has been noted to make contact with solid concrete for proper <br /> installation of hold down. <br /> 11. Engineering calcs have been attached. <br /> 12. Wall legend has been added to page 8 and referenced on pages 6 & 7. <br /> 13. The basement was and is to remain unfinished as noted for #5 above. Since <br /> there was nothing being changed down there, I did not spend much time there, just <br /> enough to take a few measurements. Ray assured me that there exists a framed out <br /> wall at the interior basement foundation walls. <br /> Please let me know if there is anything else. <br /> Thanks. D Ui �1J <br /> 7effHarlan hi AUG 2 3 2013 <br /> Jeff@threenaildeisgns.com <br /> C17Y OF <br /> Permit Secvices <br /> �3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.