Laserfiche WebLink
Building Manufacturers (11.8 MB PDF).Alterations require an L&I permit unless the building is being installed on a <br /> permanent foundation. In that case, permits from the city of jurisdiction and L&I electrical program are required. <br /> (This is from http://www.Ini.wa.gov/TradesLicensing/FAS/OtherMobileStructures/default.asp. I can send other <br /> examples if you need them). <br /> But I think WAC 296-15OF-0010 under Chapter 296-15OF WAC, FACTORY-BUILT HOUSING AND COMMERCIAL <br /> STRUCTURES is the most clear. (Italics on 2(b) are mine. ) <br /> WAC 296-15OF-0010 <br /> Authority, purpose, and scope. <br /> (1)This chapter is authorized by RCW 43.22.420,43.22.434 and 43.22.450 through 43.22.490, covering the construction <br /> and approval of factory-built housing and commercial structures before occupancy. <br /> (2) This chapter applies to the approval: <br /> (a) Of factory-built structures used for residences or commercial purposes; and <br /> (b)After occupancy of a factory-built house or commercial structure, all inspections are done by the local enforcement <br /> agency. <br /> I would like to request that the City of Everett review and permit the tenant improvement for building D (a factory-built <br /> commercial structure ) located at ACES High school. <br /> Feel free to contact me if more information is required. <br /> Thanks very much for your time on this. <br /> Scott Connor <br /> SCR I Architects <br /> 206-458-7517 <br /> scott@scr-arch.com <br /> 3 <br />