My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
R L Alia Company 5/4/2017
>
Contracts
>
Capital Contract
>
R L Alia Company 5/4/2017
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/2/2018 10:23:48 AM
Creation date
5/25/2017 9:59:28 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
R L Alia Company
Approval Date
5/4/2017
Council Approval Date
3/29/2017
Department
Public Works
Department Project Manager
David Voigt
Subject / Project Title
Hayes Street Regulator and CSO Controls
Public Works WO Number
UP3398
Tracking Number
0000647
Total Compensation
$3,034,395.00
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
R L Alia Company 11/28/2017 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
416
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> 3. Assessing the impact of any actual,potential or proposed change, including,but not <br /> limited to,the financial impact resulting from schedule changes and changes to the <br /> scope of Work. <br /> 4. Supporting the basis for construction payments. <br /> 5. Planning by City and tenants. <br /> 6. Avoiding additional or extra costs or expenses to the City. <br /> All schedules will be reviewed by the City and the City's Representative. The City or City's <br /> Representative's review of any schedule shall not transfer the Contractor's responsibilities to <br /> the City. Review shall not constitute approval or acceptance of the Contractor's construction <br /> means, methods, sequencing, logic, order, precedence and succession of activities or <br /> Contractor's ability to complete the Work in a timely manner. Any mistakes or errors in any <br /> schedule, including, but not limited to, mistakes or errors of logic, order, precedence, and <br /> duration, are and remain the Contractor's. The City or City's Representative may, however, <br /> comment upon the schedule. The Contractor remains wholly responsible for completing the <br /> Work within the Contract duration. Any comments by City or City's Representative personnel <br /> regarding the schedule shall not be construed as approval or ratification, nor shall the <br /> Contractor incorporate or change its schedule as a result of City or City's Representative <br /> comments in the absence of an express written directive to that effect. <br /> Contractor shall submit,update and maintain schedules as required by the Contract Documents. <br /> The Contractor shall provide sufficient material, equipment, and labor to meet the interim <br /> milestones, Substantial Completion, Physical Completion and Completion Dates provided by <br /> the Contract Documents. The City allocates its resources to a Contract based on the total time <br /> allowed in the Contract. The Contractor may submit a schedule indicating Completion Date <br /> earlier than the end of Contract Time, but City cannot guarantee its resources will be available <br /> to meet such schedule. City shall not pay or be liable for any additional compensation if the <br /> Contractor is not able to meet a schedule that indicates a Completion Date earlier than the end <br /> of Contract Time. <br /> Failure to schedule City furnished or installed materials and Equipment for installation on or <br /> after its planned arrival pursuant to the City's Contract with the supplier or failure to notify the <br /> City in writing of tasks dependent upon the fact or date of arrival of such City furnished <br /> materials and Equipment, constitute a waiver by Contractor of any Contract Claim arising out <br /> of or related to the timeliness of the furnishing or installation of such material and Equipment. <br /> All schedules shall allow for timely incorporation of any other's work under separate contract <br /> with City and for timely incorporation of any work provided and installed by City. Unless <br /> otherwise expressly authorized in writing by the City's Representative, the Contractor shall <br /> integrate the schedules with the Schedule of Values and unit price items so that each <br /> construction activity is represented by a dollar value. <br /> Float in a progress schedule belongs to the City. <br /> Subcontractors shall review all schedules prior to submission to the City and City's <br /> Representative. At the City's option and sole discretion, City may require Contractor to obtain <br /> written acceptance of each schedule by Subcontractors as practical and feasible, as the schedule <br /> relates to Subcontractors'work. <br /> Contractor shall not schedule any activity with an unrealistic, unduly long, or unduly short <br /> duration. Contractor shall use its best efforts in good faith to set reasonable durations for all <br /> activities. Contractor shall not attempt to "grab the Float" or make an effort to use Float in the <br /> Progress Schedule for the benefit of the Contractor, rather than the benefit of the Project. <br /> Contractor shall use its best efforts in good faith to minimize dependencies, minimize the <br /> number of critical paths,and schedule the Project to be complete as expeditiously as reasonably <br /> possible. <br /> HAYES STREET REGULATOR February, <br /> 2017 1 <br /> AND CSO CONTROLS (SRO1, SRO2,AND SRO3) <br /> WO No—UP3398-31 SP -99 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.