My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
R L Alia Company 5/4/2017
>
Contracts
>
Capital Contract
>
R L Alia Company 5/4/2017
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/2/2018 10:23:48 AM
Creation date
5/25/2017 9:59:28 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
R L Alia Company
Approval Date
5/4/2017
Council Approval Date
3/29/2017
Department
Public Works
Department Project Manager
David Voigt
Subject / Project Title
Hayes Street Regulator and CSO Controls
Public Works WO Number
UP3398
Tracking Number
0000647
Total Compensation
$3,034,395.00
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
R L Alia Company 11/28/2017 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
416
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> activity. The percent complete for that activity should also be shown. If during the course <br /> of construction the Contractor desires or feels it necessary to make changes in the <br /> schedule logic, these changes should be identified, highlighted, and specifically and <br /> expressly brought to the attention of the City's Representative and City along with the <br /> schedule update. <br /> An updated progress schedule shall show changes occurring since submission of the <br /> previous updated progress schedule such as: i <br /> 1. Major changes in scope; ■ <br /> 2. Activities modified since previous submission; <br /> 3. Revised projection for construction completion,as applicable; and <br /> 4. Any other changes. <br /> Contractor shall submit an updated progress schedule for review by the City and City's <br /> 111 <br /> Representative, at the weekly construction meeting or as otherwise as requested by City's <br /> Representative or City. Any deviation from the Baseline Schedule shall be explained by <br /> the Contractor, including the cause and effect of the deviation. Contractor shall state in <br /> writing the corrective measures it will take to bring the progress of the Work back in line <br /> with the Baseline Schedule. <br /> Once an actual start or completion date is stated in a submitted progress schedule, <br /> Contractor shall not change schedule without prior written agreement of the City and <br /> City's Representative. <br /> With each submitted updated progress schedule, Contractor shall provide a written <br /> narrative report that identifies anticipated or actual deviations from the Baseline <br /> Schedule, causes of the deviations, and the impact of the deviations on the schedule and <br /> describes the corrective action taken or proposed, and its effect. <br /> 1-08.3(3) Schedule Updates 1 <br /> Delete 1-08.3(3)and substitute the following: <br /> 1-08.3(3) Schedule Format and Content <br /> (******) <br /> 1-08.3(3)A Schedule Format <br /> All schedules shall be in the following form: <br /> 1. Network analysis system using the current version of Microsoft Project software <br /> and the critical path method, as outlined in The Associated General Contractors <br /> of America(AGC)publication "The Use of CPM in Construction -A Manual for <br /> General Contractors." <br /> 2. Sequence of Listings: The chronological order of the start of each activity of <br /> Work. Listings on Progress Schedule and Schedule of Values shall be the same. <br /> 3. Scale and Spacing: To provide space for notations and revisions. <br /> 4. Each schedule and update shall be provided in three (3) paper copies and three <br /> (3) electronic copies in current Microsoft Project 2007 format. Paper copies shall <br /> be on a single sheet of paper and of sufficient size to allow legibility of schedule. <br /> Pieces of the schedule on separate sheets of paper that must be taped together to <br /> form schedule are not permitted. Electronic copies shall be submitted on either <br /> separate CD-ROMs or as email attachment to City's Representative. <br /> 5. Updated Progress Schedules shall indicate progress of the Work to the date of <br /> submission by drawing a vertical line down the schedule to represent Work <br /> completed to date. <br /> HAVES STREET REGULATOR February, 2017 <br /> AND CSO CONTROLS (SRO1, SRO2, AND SRO3) <br /> WO No—UP3398-31 SP - 101 <br />
The URL can be used to link to this page
Your browser does not support the video tag.