R L Alia Company 5/4/2017
>
Contracts
>
Capital Contract
>
R L Alia Company 5/4/2017
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/2/2018 10:23:48 AM
Creation date
5/25/2017 9:59:28 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
R L Alia Company
Approval Date
5/4/2017
Council Approval Date
3/29/2017
Department
Public Works
Department Project Manager
David Voigt
Subject / Project Title
Hayes Street Regulator and CSO Controls
Public Works WO Number
UP3398
Tracking Number
0000647
Total Compensation
$3,034,395.00
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
R L Alia Company 11/28/2017 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
416
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
i <br /> 1.09.9(2) Review Procedures <br /> The City's Representative will review the estimate and either indicate in writing to the City his <br /> or her concurrence with the estimate and his or her recommendation that payment be made, or <br /> indicate in writing to the Contractor his or her reasons for not concurring with the estimate. If <br /> the City's Representative recommends payment and the City concurs, the City will pay the <br /> ' Contractor a progress payment on the basis of the approved partial payment estimate, less <br /> retainage and any amounts the City may withhold pursuant to Contract or law. The <br /> recommendation of the City's Representative is not conclusive, final or binding upon the City. <br /> In the event the City's Representative does not concur with the estimate, the Contractor may <br /> make the changes necessary to obtain the City's Representative's concurrence and resubmit the <br /> partial payment estimate, or submit the original progress payment estimate directly to the City, <br /> indicating in writing its reasons for refusing to make the changes necessary to obtain <br /> concurrence. <br /> 1-09.9(3) Withholding Payment <br /> The City's Representative may refuse to recommend the whole or any part of any payment if in <br /> the City's Representative's opinion it would be incorrect to make such recommendation to the <br /> City. The City's Representative may also refuse to recommend any such payment,or because of <br /> subsequently discovered evidence or the result of tests, may nullify any such payment <br /> previously recommended to such extent as may be necessary in the City's Representative's <br /> opinion to protect the City from loss as a result of: <br /> 1. Defective or damaged Work. <br /> 2. A deductive Change Order. <br /> 3. Persistent failure of the Contractor to perform the Work in accordance with the <br /> Contract Documents, including failure to maintain the progress of the Work in <br /> accordance with the construction schedule. Persistent failure to maintain the progress <br /> of the Work shall mean that for a period of two consecutive months following a <br /> written notice from the City's Representative or City, the Contractor fails to correct a <br /> behind-schedule condition at a rate that would reasonably indicate that it will finish <br /> the Project on schedule. <br /> 4. Disregard of authority of the City or City's Representative or the laws of any public <br /> body having jurisdiction. <br /> 5. Liquidated damages. <br /> 6. Misrepresentation of the quality of materials or Equipment installed or amount of <br /> Work performed. <br /> 7. Discovery that a previous pay estimate erred with respect to the amount of Work <br /> performed or Equipment or materials installed, irrespective of the City's <br /> ' Representative's recommendation at the time of the progress pay estimate. <br /> The City may refuse to make payment of the full amount recommended by the City's <br /> Representative because of Contract Claims made against the City on account of Contractor's <br /> performance or furnishing the Work or because of liens filed in connection with the Work or <br /> other set offs entitling City to reduce the amount recommended. In such case, the City shall <br /> give Contractor prompt written notice with copy to the City's Representative stating the reasons <br /> ' for each action. <br /> 1-09.9(4) Final Payment Procedure <br /> Upon receipt of Contractor's written Notice that the Work is ready for final inspection and <br /> acceptance and upon receipt of a Final Contract Voucher Certification,the City's Representative <br /> will inspect the Work. If the City's Representative finds the Work acceptable under the Contract <br /> Documents and the Contract fully performed and if the Contractor has signed a Final Contract <br /> ' Voucher Certification, the City's Representative will issue a final Certificate for Payment. The <br /> HAYES STREET REGULATOR February,2017 <br /> AND CSO CONTROLS (SRO1, SRO2,AND SRO3) <br /> ' WO No—UP3398-31 SP - 120 <br />