Laserfiche WebLink
5. All other incidentals necessary for providing the construction signs according to the <br /> approved traffic control plan(s). <br /> ' Signs, posts, or supports that are lost, stolen, destroyed, or which the Engineer deems to be <br /> unacceptable, while their use is required on the project, shall be replaced by the Contractor <br /> without additional compensation. <br /> ' 1-10.4 Measurement <br /> Delete 1-10.4 and substitute the following: <br /> 1-10.4 Measurement <br /> ' 1-10.4(1) General <br /> (******) <br /> When the Bid Proposal does not include an item for any necessary traffic control, all costs for <br /> ' traffic control shall be included, by the Contractor, in the unit contract price for the various <br /> other items of Work in the Bid Proposal. The Contractor shall estimate these costs based on the <br /> contemplated work procedures. <br /> When traffic control items are included in the Bid Proposal,payment is limited to the following <br /> areas: <br /> The entire project area under the Contract and for a distance to include the initial warning signs <br /> for the beginning of the Project and the end of construction. Warning signs for side roads on the <br /> approved traffic control plan are also included. If the project consists of two or more sections, <br /> the limits will apply to each section individually. <br /> ' A detour provided in the Plans or approved by the Engineer for by-passing all or any portion of <br /> the construction, irrespective of whether or not the termini of the detour are within the limits of <br /> the Contract. <br /> ' The provisions of Section 1-04.6 will not apply to traffic control or traffic control items. <br /> However, the item "Maintenance and Protection of Traffic Control" will be considered for an <br /> equitable adjustment only when the total Contract price increases or decreases by more than 25 <br /> percent. <br /> The measurement and payment for the items included in the Bid Proposal for traffic control <br /> costs incurred within the limits of 1 and 2 above will be made to the Contractor by the City as <br /> described in these Special Provisions. <br /> 1-10.4(2) Measurement <br /> (******) <br /> ' Bid items of Work completed pursuant to the Contract Documents will be measured as <br /> described in Division B — Bid Item Descriptions of these Special Provisions and Section 1-09 <br /> MEASUREMENT AND PAYMENT of the Standard Specifications. <br /> ' 1-10.5 Payment <br /> Delete 1-10.5 and substitute the following: <br /> 1-10.5 Payment <br /> (******) <br /> Payment for bid items of Work completed pursuant to the Contract Documents will be as <br /> described in Division B — Bid Item Descriptions of these Special Provisions and Section 1-09 <br /> MEASUREMENT AND PAYMENT of the Standard Specifications. <br /> ADD NEW SECTION 1-11 <br /> ' 1-11 MISCELLANEOUS <br /> (******) <br /> 1 <br /> HAYES STREET REGULATOR February, 2017 <br /> ' AND CSO CONTROLS (SRO1, SRO2,AND SRO3) <br /> WO No—UP3398-31 SP- 136 <br />