My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
R L Alia Company 5/4/2017
>
Contracts
>
Capital Contract
>
R L Alia Company 5/4/2017
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/2/2018 10:23:48 AM
Creation date
5/25/2017 9:59:28 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
R L Alia Company
Approval Date
5/4/2017
Council Approval Date
3/29/2017
Department
Public Works
Department Project Manager
David Voigt
Subject / Project Title
Hayes Street Regulator and CSO Controls
Public Works WO Number
UP3398
Tracking Number
0000647
Total Compensation
$3,034,395.00
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
R L Alia Company 11/28/2017 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
416
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> IDIVISION 2—EARTHWORK <br /> I2-01 CLEARING, GRUBBING AND ROADSIDE CLEANUP <br /> 2-01.2 Disposal of Usable Material and Debris <br /> ISupplement 2-01.2 by adding the following: <br /> When requested by the property owner,trim trees of sufficient size for fire wood, cut into two- <br /> foot rounds and neatly stack on adjacent property. Remove and dispose of stumps, large roots, <br /> Ilimbs and branches. <br /> 2-01.2(1) Disposal Method No. 1 —Open Burning <br /> I Delete 2-01.2(1). <br /> 2-01.4 Measurement <br /> Delete all paragraphs of 2-01.4 and substitute the following: <br /> I Bid items of Work completed pursuant to the Contract Documents will be measured as <br /> described in Division B — Bid Item Descriptions of these Special Provisions and Section 1-09 <br /> MEASUREMENT AND PAYMENT of the Standard Specifications. <br /> 1 2-01.5 Payment <br /> Delete all paragraphs in 2-01.5 and substitute the following: <br /> Payment for bid items of Work completed pursuant to the Contract Documents will be as <br /> I described in Division B — Bid Item Descriptions of these Special Provisions and Section 1-09 <br /> MEASUREMENT AND PAYMENT of the Standard Specifications. <br /> If there is no bid item to cover clearing and grubbing, then clearing and grubbing shall be <br /> Iincluded with other work with no direct compensation made. <br /> 2-02 REMOVAL OF STRUCTURES AND OBSTRUCTIONS <br /> 1 2-02.1 Description <br /> Delete 2-02.1 and substitute the following: <br /> I The Work shall consist of the removal, disposal or abandoning in-place of various existing <br /> improvements including, but not limited to, pavements, structures, pipe, curbs, curb and gutter, <br /> gutter, valves, manholes, catch basins and other items necessary for the accomplishment of the <br /> I improvement. <br /> All Work with asbestos-cement pipe shall conform to the "Recommended Standard Asbestos- <br /> Cement Pipe Work Practice Procedure and Training Requirements," latest edition, as published <br /> I by the American Water Works Association, Pacific Northwest Section. Remove and dispose of <br /> Asbestos-Cement pipe in accordance with the practices specified by the State of Washington <br /> Department of Ecology and the Snohomish County Solid Waste Division. <br /> I 2-02.3 Construction Requirements <br /> 2-02.3(2) Removal of Bridges,Box Culverts and Other Drainage Structures <br /> Supplement 2.02.3(2)by adding the following: <br /> I When removing structures such as manholes, inlets, or vaults that interfere with the <br /> construction, properly plug all pipe openings abandoned in-place watertight with <br /> Commercial Concrete, or with mortar and masonry, blocks or brick. <br /> I Backfill voids with suitable job excavated material where structures are removed. <br /> Compact suitable backfill material in accordance with 2-03.3(14)C. <br /> If the Engineer determines the job-excavated material unsuitable for backfill then <br /> IContractor shall obtain Gravel Borrow or CDF as directed, to complete backfilling the <br /> HAYES STREET REGULATOR February,2017 <br /> AND CSO CONTROLS (SRO1, SRO2, AND SRO3) <br /> I <br /> WO No—UP3398-31 SP- 138 <br />
The URL can be used to link to this page
Your browser does not support the video tag.