Laserfiche WebLink
r <br /> voids. If a pay item for Gravel Borrow or CDF is not included in the Proposal, then <br /> providing Gravel Borrow or CDF for backfill shall be considered as Extra Work under 1- <br /> 04.4, <br /> 2-02.3(3) Removal of Pavement,Sidewalks,Curbs,and Gutters <br /> Delete 2-02.3(3)and substitute the following: <br /> 2-02.3(3) Removal of Existing Street Improvements <br /> (******) <br /> 2-02.3(3)A Description <br /> The Work shall consist of the removal and disposal of various existing improvements <br /> including, but not limited to, pavements, curb, curb and gutter, gutter and other items <br /> necessary for the accomplishment of the improvement. <br /> 2-02.3(3)B Removal of Pavement <br /> Remove full depth existing permanent type pavement and driveway pavement shown on <br /> the Plans or as directed by the Engineer. <br /> Replace, at no expense to the City, existing pavement designated to remain that is <br /> damaged during the pavement or concrete base removal. <br /> 2-02.3(3)B1 Sawcutting <br /> Make vertical full depth saw cut between existing asphalt concrete pavement, to <br /> remain and the portion to be removed. <br /> Where asphalt concrete pavement overlays cement concrete pavement base, saw cut <br /> in accordance with 2-02.3(6) Sawing and Line Drilling. I <br /> 2-02.3(3)C Removal of Curb,Curb and Gutter <br /> Remove existing curbs where shown on the Plans or where encountered in the Work and <br /> designated by the Engineer. <br /> Existing curb and gutter includes, but is not limited to, cement concrete, cement concrete <br /> curb with a brick gutter and a cement concrete back, or other combinations of rigid <br /> materials. Remove the entire curb and gutter section,regardless of material composition. <br /> 2-02.3(3)C 1 Sawcutting <br /> Make vertical full depth saw cut between existing curb or curb and gutter to remain <br /> and the portion to be removed. <br /> 2-02.3(3)D Removal of Cement Concrete Sidewalks <br /> Concrete slabs that average four-inches or less in thickness will be considered as <br /> sidewalk removal. <br /> Protect existing concrete walk that is to remain in place, from equipment damage by <br /> using planking or cover with rock free eight-inch thick blanket of excavated soil. <br /> Provide Engineer with proposed pavement breakers before use and do not begin breaking <br /> pavement without Engineer's approval of the pavement breakers. <br /> 2-02.3(3)D1 Sawcutting <br /> Make vertical full depth saw cut between existing cement concrete sidewalk to <br /> remain and the portion to be removed at the nearest scribe marks beyond the neat line <br /> limits, or to the nearest joint. <br /> No diagonal cuts in sidewalk will be allowed unless otherwise indicated on the Plans <br /> or directed by the Engineer. <br /> r <br /> HAYES STREET REGULATOR February, 2017 <br /> AND CSO CONTROLS (SROI., SRO2, AND SRO3) <br /> WO No—UP3398-31 SP - 139 <br />