My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
R L Alia Company 5/4/2017
>
Contracts
>
Capital Contract
>
R L Alia Company 5/4/2017
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/2/2018 10:23:48 AM
Creation date
5/25/2017 9:59:28 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
R L Alia Company
Approval Date
5/4/2017
Council Approval Date
3/29/2017
Department
Public Works
Department Project Manager
David Voigt
Subject / Project Title
Hayes Street Regulator and CSO Controls
Public Works WO Number
UP3398
Tracking Number
0000647
Total Compensation
$3,034,395.00
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
R L Alia Company 11/28/2017 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
416
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> I <br /> 6-02.3(29) Siphon Headworks(SHW)Modifications <br /> Section 6-02.3 (29)is added as follows: <br /> The siphon headworks modifications are comprised of 1)demolition and removal of the above <br /> L ground concrete entry structure and, 2) internal structural hydraulic modification consisting of <br /> connection a new 72-inch inlet pipe; modification of concrete weir-walls; removal of a steel- <br /> liner from an existing concrete parshall flume, and applying an epoxy coating on new and <br /> existing internal concrete walls within the SHW <br /> 6-02.3(29)A General <br /> The Contractor shall be responsible for the stability of the structure during Construction. <br /> Submit a Construction and Demolition Plan,conforming to the requirements of Type 2 Working <br /> Drawings per Section 1-05.3, indicating methodologies, equipment, and work necessary to <br /> perform the SHW modifications as shown in the Plans. Do not undermine existing SHW <br /> components dueto excavation or removal of material. Provide full support to the existing CSO <br /> chamber during construction to avoid inducing additional loading on the SHW wall and provide <br /> details of support. If, at the Engineer's judgment, the SHW is loaded in such a way that the <br /> structural integrity may be compromised as a result of the proposed and/or actual construction <br /> methodologies, or if temporary falsework or bracing is required, the Contractor shall provide <br /> Type 2E Working Drawings, demonstrating the falsework design and any loading induced into <br /> the SHW is acceptable. <br /> Include in the Construction and Demolition Plan details and design of any temporary shoring <br /> required for excavation stabilization. Comply with Section 2-09 for submittal and design <br /> requirements of shoring and/or cofferdams. <br /> No construction vehicles shall be allowed on the roof of the SHW. Construction live load on the <br /> roof of the SHW shall be limited to 25 psf during construction. <br /> 6-02.3(29)B Siphon Headworks Entry Structure Demolition <br /> Prior to contractor demolition, the City will remove all existing electrical and ventilation <br /> equipment from the entry structure. The above ground entry to the below underground siphon <br /> headworks structure shall demolished and removed off-site. The roof and concrete walls shall <br /> be removed from the existing concrete top-slab of the underground siphon headworks structure. <br /> For any existing reinforcing steel that is exposed due to existing concrete removal, remove bar <br /> 1 inch beyond the surface of concrete and patch with an epoxy grout. <br /> Contractor shall cut opening in existing top-slab and fill the partial-slab void of the entry <br /> staircase opening as indicated on the plan to conform to proposed new access hatches. <br /> Contractor shall remove the above ground handrail and modify the hand-rail portion below the <br /> slab on the existing staircase.to conform to new hatch. <br /> Contractor shall provide two access hatches manufactured to fit the blockout dimensions as <br /> shown in the Plans. Hatches shall connect to a steel angle attached to existing concrete as <br /> shown in the Plans. Hatches shall be capable of supporting 90 psf pedestrian live loading and <br /> shall be aluminum, stainless steel, or galvanized steel. Submit details of hatch including <br /> connection detail to Engineer prior to fabrication. <br /> 6-02.3(29)C Trunk C Connection and Flow Modifications <br /> Contractor shall demolish portions of the siphon headworks wall and construct structural <br /> modifications to connect proposed 72-inch pipe and also remove and modify existing concrete <br /> weir walls within the siphon headworks structure inlet chamber of the siphon pipes, all as <br /> indicated in the plans. Contractor shall furnish and install new additional manhole access and <br /> an adjustable steel weir plate on new concrete weir wall as indicated in the plans for SRO3. <br /> I <br /> HAYES STREET REGULATOR February,2017 <br /> AND CSO CONTROLS (SRO1,SRO2,AND SRO3) <br /> WO No—UP3398-31 SP- 159 <br />
The URL can be used to link to this page
Your browser does not support the video tag.