Laserfiche WebLink
I <br /> Payment for bid items of Work completed pursuant to the Contract Documents will be as <br /> described in Division B — Bid Item Descriptions of these Special Provisions and Section 1-09 <br /> MEASUREMENT AND PAYMENT of the Standard Specifications. <br /> 7-05 MANHOLES,INLETS,AND CATCH BASINS <br /> 7-05.1 Description <br /> Revise the first paragraph in 7-05.1 to read as follows: <br /> This Work consists of constructing manholes, inlets, drywells, and catch basins and connecting <br /> to existing Structures of the types and sizes designated in accordance with the Plans, these <br /> Special Provisions, the Specifications, and the COE Standard Drawings, in conformity with the <br /> lines and grades staked. <br /> Further supplement 7-05.1 as follows: I <br /> 7-05.1(1) Submittals <br /> (******) <br /> Provide Type 2 Working Drawings for all materials and Standard Plans. <br /> 7-05.2 Materials <br /> Supplement 7-05.2 by adding the following at the end of the material list: <br /> Mortar,nonshrink 9-20.3(2) Standard Specifications r- <br /> Commercial Concrete 6-02.3(2)B Standard Specifications <br /> Watertight Connection Boots 9-05.30 Special Provisions <br /> Flexible Couplings 9-05.40 Special Provisions <br /> Polypropylene Manhole Steps 9-05.64 Special Provisions <br /> Hand Holds <br /> Polypropylene Manhole Ladder 9-05.66 Special Provisions <br /> 7-05.3 Construction Requirements <br /> Supplement 7-05.3 by adding the following after the last sentence of the third paragraph: <br /> Install PAMREX, East Jordan Iron Works, or equal, hinged manhole frame and cover in <br /> accordance with manufacturer recommendations and applicable City standards and details. <br /> Coordinate manhole cover and frame hinge location with manhole steps and traffic lanes. Hinge <br /> orientation to be determined during the shop drawing review of precast manhole structures. <br /> Supplement 7-05.3 by adding the following to the end of the fourth paragraph: <br /> A field-formed channel and shelf shall not be installed in a manhole until after low pressure air <br /> testing has been successfully completed for all new connected pipes except where approved in <br /> advance by the City. <br /> Delete the tenth paragraph in 7-05.3. <br /> Revise the eleventh paragraph in 7-05.3 to read as follows: <br /> Provide Kor-N-Seal, or equal, watertight flexible pipe to manhole connectors for pipes up to <br /> 48-inch diameter connecting to new sanitary sewer manholes. Place no pipe joint in PVC or <br /> HDPE pipe within 10-feet of the outside face of the manhole. <br /> Revise the last sentence in the sixteenth paragraph in 7-05.3 to read as follows: <br /> Provide manholes, inlets, and catch basins that upon final acceptance of the Work conforms to <br /> the following COE Standard Drawings requirements: <br /> 1. Manholes No. 605A, 60513 and 605C as applicable <br /> 2. Inlets No. 401 <br /> 3. Catch Basins No. 402,403 and 404 as applicable <br /> 111 <br /> HAYES STREET REGULATOR February,2017 <br /> AND CSO CONTROLS (SRO1, SRO2,AND SRO3) <br /> WO No— UP3398-31 SP - 163 <br />