1 <br /> The force account item for pothole will only be used at the direction of the Engineer. The general <br /> excavation and locating of utilities along the proposed pipe alignments will be incidental to the <br /> various pipe (sanitary sewer pipe, side sewer services, storm sewer pipe, water main, and water <br /> services)bid items. <br /> Bid Item 2—SURVEYING <br /> Specification Section 1-05 <br /> Measurement and Payment: Lump Sum <br /> The lump sum bid for surveying includes all costs associated with furnishing all labor, tools, I <br /> survey instruments materials, and other equipment necessary for the setting and monitoring the <br /> location, elevation, alignment and grade of the work as specified in Section 1-05.4 of the <br /> Standard Specifications and these Special Provisions and the Drawings. <br /> The lump sum bid item also includes all costs associated with furnishing all labor, tools, survey <br /> instruments,materials and other equipment necessary for verifying the rim and invert elevations, <br /> prior to construction, of all existing manholes and pipes where connections are to be made. <br /> The lump sum also includes all costs associated with furnishing all labor, tools, survey <br /> instruments, materials and other equipment necessary for obtaining the "as constructed" location <br /> and elevations of the Contract work, in particular, sewer pipe invert elevations and other <br /> information necessary for production of the Record Drawing (As-Constructed) documents <br /> meeting the requirements defined in Section 1-08.11 of these Special Provisions. <br /> Measurement for surveying shall be the ratio of actual pipe installed and backfilled to the total <br /> quantity of pipe listed in the proposal. <br /> Bid Item 3—SPILL PREVENTION,CONTROL AND COUNTERMEASURES PLAN <br /> Specification Section 1-07 <br /> Measurement and Payment: Lump Sum <br /> This lump sum unit price includes all costs associated with preparing and implementing a <br /> project-specific spill prevention, control, and countermeasures plan (SPCC Plans) in accordance <br /> with Section 1-07.15(1) of the standard specifications. <br /> Bid Item 4—MOBILIZATION <br /> Specification Section 1-09 <br /> Measurement and Payment: Lump Sum <br /> The lump sum bid for mobilization shall constitute complete compensation for all <br /> preconstruction costs of preparatory work and operations performed by the Contractor, <br /> including, but not limited to, those necessary for the movement of his personnel, equipment, <br /> supplies and incidentals to the project site; for the establishment of his offices, buildings and <br /> other facilities necessary for work on this project; for premiums on bonds and insurance for the <br /> project, and for work and operations which he must perform or costs he must incur before <br /> beginning production work on the various items on the project site. Mobilization also includes, <br /> but is not limited to: posting construction identification signs, securing permits, establishing <br /> safety and security measures, submitting the project schedule and providing product/materials <br /> submittals. Mobilization costs for all subcontracted work shall be considered to be included. This <br /> lump sum bid item includes all costs for utility coordination as noted in the plans and <br /> specifications. <br /> 111 <br /> HAYES STREET REGULATOR February, 2017 <br /> AND CSO CONTROLS (SRO1, SRO2, AND SRO3) <br /> WO No—UP3398-31 SP - 26 1 <br />