DIVISION 1 —GENERAL REQUIREMENTS <br /> Supplement Division 1 by adding the following: <br /> General Description and Location of Project <br /> (******) <br /> Work being performed includes constructing approximately 550 LF of new combined sewer pipe <br /> (30-inch to 72-inch dia.); removal of approximately 325 LF of existing combined sewer pipe (30- <br /> inch to 48-inch dia.); construction of five (5) separate underground flow regulator, screening, or <br /> ' monitoring concrete vaults; structural modifications within a large existing underground concrete <br /> siphon-pipe headworks facility, including demolition of the above-ground entry structure; manhole <br /> furnish and install mechanical screen equipment system at lift station #9; installation of temporary <br /> flow diversion and bypass systems; approximately 180 LF of existing 8-inch gravity sanitary sewer <br /> ' relocation and service re-connects; electrical power and control ductbanks; construction of <br /> approximately 600 LF of new 24-foot wide paved access drive; existing street and site asphalt <br /> pavement restoration; permanent fence installation,landscaping and performing all Work as required <br /> by the Contract, in accordance with the Contract Plans and Contract Provisions. <br /> The Project is in Everett, Washington, and is generally located on South 2nd Avenue/South Junction <br /> Avenue between Ravenna Street and South 3rd Avenue, South 3rd Avenue between Main Street and <br /> 41' Street, Main Street between South 3rd Avenue and South 2nd Avenue, Biglow Street between <br /> South 4th Street and South 3rd Street,and 49th Street between South 3rd Avenue and South 2nd Avenue. <br /> ' Design Engineer <br /> (******) <br /> Questions and inquiries about these Contract Documents should be directed in writing to the <br /> attention of Dave Voigt,City Project Manager,dvoigt@everettwa.gov. <br /> 1 Standard Specifications <br /> (******) <br /> All Work under this Contract shall be performed in accordance with the following Specifications <br /> except as may be exempted or modified by other sections of these Contract Documents. These <br /> Specifications are incorporated by reference,made a part of this Contract and shall control and guide <br /> all activities within this Project whether referred to directly,paragraph by paragraph. <br /> WSDOT/APWA"2016 Standard Specifications for Road, Bridge and Municipal Construction,"as <br /> amended by the APWA Supplements, hereinafter referred to as the"Standard Specifications." <br /> The Standard Specifications, as modified or supplemented by the Amendments to the Standard <br /> Specifications and these Special Provisions,all of which are made a part of the Contract Documents, <br /> shall govern all of the Work. The following latest edition of other specifications and standard plans <br /> shall apply to the extent to which they are called out in these Plans and Special Provisions. <br /> 1. City of Everett "Design and Construction Standards and Specifications," latest edition as <br /> found on the Web at http://everettwa.gov/DocumentCenterMew/243. <br /> 2. "Standard Plans for Road and Bridge Construction,"as prepared by WSDOT. <br /> 3. "Manual on Uniform Traffic Control Devices(MUTCD)." <br /> 4. APWA Standards. <br /> 5. AWWA Standards. <br /> Each Provision of these Special Provisions either supplements, modifies, or replaces the comparable <br /> Standard Specification, or is a new Provision. The deletion, amendment, alteration, or addition to <br /> any subsection or portion of the Standard Specifications is meant to pertain only to that particular <br /> portion of the section, and in no way should it be interpreted that the balance of the section does not <br /> apply. <br /> HAYES STREET REGULATOR February, 2017 <br /> ' AND CSO CONTROLS (SRO1, SRO2,AND SRO3) <br /> WO No—UP3398-31 SP - 49 <br />