My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
R L Alia Company 5/4/2017
>
Contracts
>
Capital Contract
>
R L Alia Company 5/4/2017
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/2/2018 10:23:48 AM
Creation date
5/25/2017 9:59:28 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
R L Alia Company
Approval Date
5/4/2017
Council Approval Date
3/29/2017
Department
Public Works
Department Project Manager
David Voigt
Subject / Project Title
Hayes Street Regulator and CSO Controls
Public Works WO Number
UP3398
Tracking Number
0000647
Total Compensation
$3,034,395.00
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
R L Alia Company 11/28/2017 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
416
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1 <br /> Contractor of an error or omission, related Work performed by the Contractor shall be <br /> done at its risk unless authorized by the City's Representative and approved by the <br /> City. <br /> 1-04.1(3)C(2) Conflicting Provisions <br /> In the event an item of Work is described differently in two or more locations on the <br /> Plans, in the Specifications and Special Provisions,the Contractor shall,upon request <br /> of the City's Representative, submit in writing to the City's Representative the <br /> description upon which the Contractor relied in preparing its Bid or laying out the <br /> Work. <br /> 1-04.1(3)D Utilities <br /> 1-04.1(3)D(1) General <br /> The City has endeavored to determine the existence of public and private utilities at <br /> the site of the Work from the records of the owners of known utilities in the vicinity <br /> of the Work. The positions of these utilities as derived from such records are shown <br /> on the Plans. Unless otherwise noted, no excavations were made to verify the <br /> locations shown for underground utilities.The service connections to the gas,electric, <br /> cable TV and communication utilities are not shown on the Plans. Refer to 1-07.17 <br /> UTILITIES AND SIMILAR FACILITIES regarding Contractor's responsibility for <br /> locating and verifying underground public and private utilities. <br /> 1-04.1(3)D(2) Unknown/Incorrectly Marked Utilities <br /> When a utility interferes with the Work and is either(1)not identified on the Plans or <br /> (2) located in a position significantly different from that specified on the Plans or in <br /> accordance with a particular utility's standard depth and location, Contractor shall <br /> follow the procedures of 1-04.7 DIFFERING SITE CONDITIONS (CHANGED <br /> CONDITIONS). Interference with the Work is defined as a utility that crosses or <br /> projects into the plane of the Work at an elevation between the top and bottom of the <br /> Work. <br /> 1-04.2 Coordination of Contract Documents, Plans, Special Provisions <br /> Specifications, and Addenda <br /> Revise the second paragraph of 1-04.2 to read as follows: <br /> Any inconsistency in the parts of the Contract shall be resolved by following this order of <br /> precedence: <br /> 1. Change Orders, <br /> 2. Addenda, <br /> 3. Contract, <br /> 4. Proposal Form, <br /> 5. Special Provisions, <br /> 6. Contract Plans, <br /> 7. City's Standard Drawings(if any), <br /> 8. WSDOT/APWA Standard Specifications for Road, Bridge,and Municipal <br /> Construction, <br /> 9. Amendments to WSDOT Standard Specifications for Road,Bridge,and Municipal I <br /> Construction,and <br /> 10. WSDOT/APWA Standard Plans for Road,Bridge and Municipal Construction. <br /> In case of any ambiguity or dispute over interpreting the Contract,the Engineer's decision will <br /> be final as provided in 1-05.1 AUTHORITY OF THE ENGINEER. <br /> HAYES STREET REGULATOR February,2017 <br /> AND CSO CONTROLS (SRO1, SRO2, AND SRO3) <br /> WO No—UP3398-31 SP - 62 <br />
The URL can be used to link to this page
Your browser does not support the video tag.