Laserfiche WebLink
1 <br /> Contractor of an error or omission, related Work performed by the Contractor shall be <br /> done at its risk unless authorized by the City's Representative and approved by the <br /> City. <br /> 1-04.1(3)C(2) Conflicting Provisions <br /> In the event an item of Work is described differently in two or more locations on the <br /> Plans, in the Specifications and Special Provisions,the Contractor shall,upon request <br /> of the City's Representative, submit in writing to the City's Representative the <br /> description upon which the Contractor relied in preparing its Bid or laying out the <br /> Work. <br /> 1-04.1(3)D Utilities <br /> 1-04.1(3)D(1) General <br /> The City has endeavored to determine the existence of public and private utilities at <br /> the site of the Work from the records of the owners of known utilities in the vicinity <br /> of the Work. The positions of these utilities as derived from such records are shown <br /> on the Plans. Unless otherwise noted, no excavations were made to verify the <br /> locations shown for underground utilities.The service connections to the gas,electric, <br /> cable TV and communication utilities are not shown on the Plans. Refer to 1-07.17 <br /> UTILITIES AND SIMILAR FACILITIES regarding Contractor's responsibility for <br /> locating and verifying underground public and private utilities. <br /> 1-04.1(3)D(2) Unknown/Incorrectly Marked Utilities <br /> When a utility interferes with the Work and is either(1)not identified on the Plans or <br /> (2) located in a position significantly different from that specified on the Plans or in <br /> accordance with a particular utility's standard depth and location, Contractor shall <br /> follow the procedures of 1-04.7 DIFFERING SITE CONDITIONS (CHANGED <br /> CONDITIONS). Interference with the Work is defined as a utility that crosses or <br /> projects into the plane of the Work at an elevation between the top and bottom of the <br /> Work. <br /> 1-04.2 Coordination of Contract Documents, Plans, Special Provisions <br /> Specifications, and Addenda <br /> Revise the second paragraph of 1-04.2 to read as follows: <br /> Any inconsistency in the parts of the Contract shall be resolved by following this order of <br /> precedence: <br /> 1. Change Orders, <br /> 2. Addenda, <br /> 3. Contract, <br /> 4. Proposal Form, <br /> 5. Special Provisions, <br /> 6. Contract Plans, <br /> 7. City's Standard Drawings(if any), <br /> 8. WSDOT/APWA Standard Specifications for Road, Bridge,and Municipal <br /> Construction, <br /> 9. Amendments to WSDOT Standard Specifications for Road,Bridge,and Municipal I <br /> Construction,and <br /> 10. WSDOT/APWA Standard Plans for Road,Bridge and Municipal Construction. <br /> In case of any ambiguity or dispute over interpreting the Contract,the Engineer's decision will <br /> be final as provided in 1-05.1 AUTHORITY OF THE ENGINEER. <br /> HAYES STREET REGULATOR February,2017 <br /> AND CSO CONTROLS (SRO1, SRO2, AND SRO3) <br /> WO No—UP3398-31 SP - 62 <br />