My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2015/09/02 Council Agenda Packet
>
Council Agenda Packets
>
2015
>
2015/09/02 Council Agenda Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/2/2015 5:22:05 PM
Creation date
9/9/2015 10:44:01 AM
Metadata
Fields
Template:
Council Agenda Packet
Date
9/2/2015
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
278
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
15 <br />�)I <br />2. Prepare agendas, presentation materials, meeting notes, and action item lists when <br />meetings are required. <br />3. Participate in meetings. <br />4. Document key telephone conversations with agencies/stakeholders. <br />Client Responsibilities <br />1. Participate in agency/stakeholder meetings. <br />2. Review and comment on meeting materials and meeting notes. <br />Assumptions <br />1. A formal pre -application is required with the City of Everett Permit Services. <br />2. One meeting is budgeted: 1) a formal pre -application meeting with the City of Everett <br />Permit Services. <br />3. The Consultant Permit Lead and Environmental Scientist will attend the meetings. <br />4. The remainder of agency coordination, will take place via telephone or email and will <br />document specific permit submittal requirements. <br />Deliverables <br />1. Draft and final City of Everett Pre -Application meeting request (PDF, via email). <br />2. Draft and final agendas, presentation materials, meeting minutes delivered to the City <br />(PDF, via email). <br />3. Telephone conversation records documenting key agency/stakeholder conversations. <br />Subtask 400.3 Permit Matrix/Permit Tracking Table/Schedule <br />-HDR Services <br />1. Prepare a Permit Matrix that includes the following information: list of permits/approvals, <br />agency requiring permit, permit trigger, detailed application submittal information, <br />processing time, and agency contact information. <br />2. Prepare a Permit/Approval Status table for tracking permit submittals during the design <br />phase. <br />3. Develop or provide input to project schedule linking permitting tasks to environmental <br />studies and design levels as appropriate for each permitiapproval. <br />Client Responsibilities <br />1. Review and provide comments on the Permit Matrix. <br />Assumptions <br />1. The Permit Matrix will be a stand alone table that will be up to two pages in length. <br />2. The Permit/Approval Status table %vill become the primary managennent/tracking tool for <br />the permifting process during the design phase. <br />3. The permit schedule ,:ill be uFcdated on a €-ricnti:l'y/ �'c.sis. <br />Ci,; :_• -,"—'L'dPC C , rson sir cur 0 114 Sccp o S,-cas <br />
The URL can be used to link to this page
Your browser does not support the video tag.