Laserfiche WebLink
1,7 <br />i <br />2. identify and provide Arc Flash hazard level label information on all equipment listed <br />in the 2015 Arc Flash study. <br />3. Deliverables <br />r coordination calibration within twelve months of <br />a. Complete circuit breake <br />contract approval. <br />b. Provide report identifying circuit breaker number and coordination calibration <br />information. Two hard copies and one electronic copy. <br />C. Complete Arc Flash hazard level label information within three months of <br />contract approval. <br />Task — 4 Critical Circuit Breaker Testing Services <br />i. Provide recommendations and plan for testing breakers rated 100A and greater. <br />2. Provide report of finding with recommendations for replacements. <br />3. Deliverables <br />a. Complete circuit breaker testing within twelve months of contract approval. <br />b. Provide report of circuit breaker testing findings with recommendations for <br />replacements within thirty days of testing completion. Two hard copies and one <br />electronic copy. <br />Task — 5 Utility Transformer Testing/ Metering Services <br />1. Provide plan and recommendations for power quality testing and demand load <br />evaluation of all onsite utility transformers. <br />2. Provide report of findings to include recommendations for replacements/upgrades. <br />3. Deliverables <br />a. Complete power quality resting and demand load evaluation within twelve <br />months of contract approval. <br />b. Provide report of findings and recommendations within thirty days of testing <br />completions. Two hard copies and one electronic copy. <br />Task — 6 on -Call Electrical Engineering Support Services <br />1. Provide one hundred hours of on-call electrical engineering support for emergent <br />projects. <br />2. Deliverables <br />a. Electrical Engineer onsite within twenty-four hours of request with the exemption <br />of holidays and weekends. <br />157 <br />