My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2015/09/02 Council Agenda Packet
>
Council Agenda Packets
>
2015
>
2015/09/02 Council Agenda Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/2/2015 5:22:05 PM
Creation date
9/9/2015 10:44:01 AM
Metadata
Fields
Template:
Council Agenda Packet
Date
9/2/2015
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
278
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
2. Identify and provide Arc Flash hazard level label information on all equipment listed <br />in the 2015 Arc Flash study. <br />3. Deliverables <br />a. Complete circuit breaker coordination calibration within twelve months of <br />contract approval. <br />b. Provide report identifying circuit breaker number and coordination calibration <br />information. Two hard copies and one electronic copy. <br />c. Complete Arc Flash hazard level label information within three months of <br />contract approval. <br />Task — 4 Critical Circuit Breaker Testing Services <br />1. Provide recommendations and plan for testing breakers rated 100A and greater. <br />2. Provide report of finding with recommendations for replacements. <br />3. Deliverables <br />a. Complete circuit breaker testing within twelve months of contract approval. <br />b. Provide report of circuit breaker testing findings with recommendations for <br />replacements within thirty days of testing completion. Two hard copies and one <br />electronic copy. <br />Task - S_lltility Transformer Testing/ Metering Services <br />1. Provide plan and recommendations for power quality testing and demand load <br />evaluation of all onsite utility transformers. <br />2. Provide report of findings to include recommendations for replacements/upgrades. <br />3. Deliverables <br />a. Complete power quality resting and demand load evaluation within twelve <br />months of contract approval. <br />b. Provide report of findings and recommendations within thirty days of testing <br />completions. Two hard copies and one electronic copy. <br />Task — 6 On -Call Electrical Engineering Support Services <br />1. Provide one hundred hours of on-call electrical engineering support for emergent <br />projects. <br />2. Deliverables <br />a. Electrical Engineer onsite within twenty-four hours of request with the exemption <br />of holidays and weekends. <br />159 <br />
The URL can be used to link to this page
Your browser does not support the video tag.