My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2015/09/02 Council Agenda Packet
>
Council Agenda Packets
>
2015
>
2015/09/02 Council Agenda Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/2/2015 5:22:05 PM
Creation date
9/9/2015 10:44:01 AM
Metadata
Fields
Template:
Council Agenda Packet
Date
9/2/2015
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
278
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EVERETT CITY COUNCIL AGENDA ITEM COVER SHEET <br />PROJECT TITLE: <br />18 <br />Authorize the Mayor to sign <br />Briefing <br />COUNCIL BILL # <br />Expenditure Required <br />the Professional Services <br />Proposed Action <br />Originating Department <br />Utilities <br />Agreement with CG <br />Consent <br />Contact Person <br />Mike Robinson <br />Engineering to provide X <br />Action <br />Phone Number <br />425-257-8884 <br />engineering design services for <br />First Reading <br />FOR AGENDA OF <br />09/02/15 <br />portal #4 refurbishment, <br />Second Reading <br />backwash pump station roof <br />Third Reading <br />modifications and WFP safety <br />Public Hearing <br />railing code requirements. <br />Budget Advisory <br />Initialed by: <br />Department Head <br />CAA <br />Council Presidents <br />Location Preceding Action Attachments Department(s) Approval <br />Water Filtration Plant None <br />Professional <br />6133 Lake Chaplain <br />Services Agreement <br />Road, Sultan WA <br />Amount Budgeted <br />$125,000 <br />Expenditure Required <br />$59,561 <br />AccountNumber(s): 401-5-200-121-651-410 <br />Budget Remaining <br />$65,439 <br />Additional Required <br />0 <br />DETAILED SUMMARY STATEMENT: <br />The Water Filtration Plant requires structural engineering services to provide for the refurbishment of portal <br />94, roof modifications to the backwash pump station and design of a safety railing system that will meet code <br />requirements. Portal 44 has suffered significant structural damage due to off gassing of chlorine fiom treated <br />water. The backwash pump station roof requires modification to accommodate the removal large pieces of <br />equipment located in the building. WFP safety railing's do not meet WAC 296-24-75011 specifications in <br />public tour route areas. This Professional Services Agreement will provide for the structural engineering <br />services required to refurbish Portal #4, modify the backwash pump station roof and bring the WFP safety <br />railings up to code. <br />RECOMMENDATION (Exact action requested of Council): <br />Authorize the Mayor to sign the Professional Services Agreement with CG Engineering to provide <br />engineering design services for portal A re-rbislunzent, backwash pump station roof modifications and W17P <br />safety railing cede re uiremen[s in tele amount of 575,561. <br />183 <br />
The URL can be used to link to this page
Your browser does not support the video tag.