My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2015/09/02 Council Agenda Packet
>
Council Agenda Packets
>
2015
>
2015/09/02 Council Agenda Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/2/2015 5:22:05 PM
Creation date
9/9/2015 10:44:01 AM
Metadata
Fields
Template:
Council Agenda Packet
Date
9/2/2015
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
278
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EXHIBIT A <br />SCOPE OF WORK <br />In general, the Service Provider will perform the following work: <br />1. Analysis of the Everett Fire Department's existing operational and management model. Are there <br />differentmodels by which the Everett Fire Department might provide its emergency response and prevention <br />services in a more efficient manner, from a response time, staff deployment, apparatus deployment and/or <br />financial perspective? <br />2. Analysis of operational and budgetary trade-offs. As the City continues to face General Fund budget <br />challenges are there opportunities to provide emergency response and prevention services at a lower cost <br />while still maintaining industry standards for response times? Alternatively, what are the service trade-offs if <br />operational or management changes need to be made in response to these budget challenges? How can <br />Everett maximize response time and effectiveness within these budget constraints? <br />These analyses and associated deliverables will be divided into the three phases outlined below. The City <br />reserves the right to modify the phases of work as required to fulfill the City's needs. <br />Phase I. <br />• Preliminary Analysis of Fire Department Operations and Management and Identification of Short- and <br />Long -Term Opportunities <br />During Phase I, the Service Provider (1) will conduct a preliminary analysis of the Fire Department's <br />management and operations, including a Risk Assessment and a Standard of Cover study. This will serve as <br />the basis for future analysis of the Fire Department During Phase I the Service Provider (2) will also conduct <br />an opportunity analysis to identify short-term and longer-term opportunities for cost, management and <br />operational efficiencies at the Everett Fire Department for future analysis and review in Phases II and III. <br />Phase I will be completed no later than four months following contract execution date. <br />a) The Service Provider will conduct an impartial, third -party data -driven analysis on all items, and <br />should rely on evidence -based practices and emergency -response theory to devise and evaluate all short-term <br />and long-term efficiency proposals. <br />b) The Phase 1 Report will include a preliminary analysis of Fire Department management and <br />operations in the form of a Risk Assessment followed by a Standard of Cover study, which together will serve <br />as a baseline assessment of the Fire Department's organizational and management structure, and its <br />operational performance. <br />C) The Phase I Report will identify a broad scope of opportunities for efficiencies, but will not include full <br />analyses of these efficiencies, which will occur in the later phases of this project. <br />d) The Phase I Report will include specific descriptions of short-term and longterm opportunities for <br />efficiencies, with rough detail on the magnitude of cost savings, labor impacts and/or service impacts <br />associated with each item identified. <br />e) Short-term efficiencies are defined as cost reduction or revenue generation items that do not impact <br />labor contracts and that can be substantively evaluated in time for consideration for inclusion in a subsequent <br />City budget <br />f) Short-term efficiencies may include, but are not limited to: efficiencies in materials and supplies <br />purchasing, staffing efficiencies among non -uniformed personnel, management efficiencies, consolidation or <br />elimination of non -uniformed departmental functions and/or revenue enhancement opportunities. <br />Page 12 <br />Fitch 201 PSA <br />76 <br />
The URL can be used to link to this page
Your browser does not support the video tag.