Laserfiche WebLink
Year 10 Monitoring of the Smith Island/Union Slough Habitat Restoration Site Everett Public Works <br /> • Aerial photo will be flown by SkyPix and cost charged to project as a direct expense. <br /> If ICF drone is available and costs are less than SkyPix aerial for equivalent or better <br /> quality, ICF would coordinate with EPWD regarding drone substitution. <br /> • All vegetation transects and monitoring points will be safe to access by walking in <br /> the site at low tide. <br /> 2. Hydrology(inundation depth, tidal exchange, development of drainage patterns) <br /> • May&June 2017- install 5 continuously recording water level data loggers in late May <br /> and record data for one month (June)timed coincide with the months of greatest tidal <br /> fluctuations, and download of data twice during recording period(as per approved April <br /> 3, 2014 Revised Mitigation Plan Addendum). <br /> • Continuous recording logger data will be interpreted along with continuous recording <br /> data collected in previous years, prior to and after removal of the bridges. <br /> • Interpretation of tidal channel development/drainage patterns based on 2017 aerial <br /> photo(as per Task 1)compared to aerial photos from prior years, before and after <br /> bridge removal and tidal channel excavation. <br /> • August field work to ground truth tidal channel extent/drainage patterns in areas not <br /> clearly visible on aerial photos would occur as part of the field effort under Task 1. <br /> Deliverables: <br /> • There is no specific deliverable for this task. The information collected and results <br /> of the analysis will be summarized in a section the report that is the Task 5 <br /> deliverable. <br /> Assumptions: <br /> • All monitoring points will be safe to access by walking in the site at low tide. <br /> • Task includes use of 5 ICF-owned HOBO U2o water level data loggers; purchase of <br /> related installation supplies will be billed as direct project expense <br /> • Control points used in past for survey of the gages are still intact and accessible <br /> 3. Water quality(temperature,salinity, dissolved oxygen) <br /> • April - May and August-September 2017—2 data collection periods during high tides <br /> in spring(high river flow conditions)and 2 data collection periods during summer high <br /> tides(low river flow conditions)(per approved April 3, 2014 Revised Mitigation Plan <br /> Addendum). <br /> Deliverables: <br /> • There is no specific deliverable for this task. The information collected and results <br /> of the analysis will be summarized in a section the report that is the Task 5 <br /> deliverable. <br /> 'ICF Page 3 <br />