My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Salas O'Brien 5/4/2017
>
Contracts
>
6 Years Then Destroy
>
2018
>
Salas O'Brien 5/4/2017
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/25/2017 11:24:07 AM
Creation date
5/25/2017 11:23:52 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Salas O'Brien
Approval Date
5/4/2017
Council Approval Date
4/19/2017
End Date
1/31/2018
Department
Parks
Department Project Manager
Lori Cummings
Subject / Project Title
Forest Park Swim Center Electrical Systems
Tracking Number
0000651
Total Compensation
$40,000.00
Contract Type
Agreement
Contract Subtype
Professional Services
Retention Period
6 Years Then Destroy
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
38
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Parks Department Swim Center Page 2 of 3 <br /> Electrical Systems Upgrades and Arc Flash Breaker Coordination Study <br /> Engineering Fee Proposal <br /> TASK 2 — Lighting Upgrade in Natatorium <br /> • Replace lighting fixtures in natatorium with new LED fixtures. <br /> • Provide new 277V circuits to the new LED lighting fixtures in natatorium. <br /> • Provide new lighting control to the lighting system in natatorium. <br /> • Provide lighting calculation drawing in natatorium performed by the lighting <br /> vendor. <br /> TASK 3 —Arc Flash Breaker Coordination Analysis <br /> • The Short Circuit Current, Protective Coordination, and Arc Flash Hazard <br /> analysis studies will be produced utilizing SKM software. Existing breakers will <br /> be coordinated to meet the maximum PPE Category Level 2 requirements (or as <br /> close as possible). A report including the studies will be provided. <br /> • Arc Flash Hazard labels will be provided for installation on equipment as <br /> required. <br /> TASK 4 — Swim Center BAS Controls Upgrade <br /> • Integrate into Task #1 drawings and specifications an upgrade to the BAS <br /> controls utilizing the equipment and information provided in the Swim Center <br /> Electrical Scope of Work documents provided by the City. <br /> DELIVERABLES: <br /> TASK 1 — Electrical Systems Upgrade <br /> • 30% Schematic Design Documents including drawings, outline specifications and <br /> ROM cost estimate. <br /> • 60% Schematic Design Documents including drawings and specifications, <br /> product cut sheets and ROM cost estimate. <br /> • 100% Construction Documents ready for bidding and permit. <br /> TASK 2 — Lighting Upgrade in Natatorium <br /> • 30% Schematic Design Documents including drawings, outline specifications and <br /> ROM cost estimate. <br /> • 60% Schematic Design Documents including drawings and specifications, <br /> product cut sheets and ROM cost estimate. <br /> • 100% Construction Documents ready for bidding and permit. <br /> TASK 3 —Arc Flash Breaker Coordination Analysis <br /> • One (1) hardcopy of the report will be provided to the Local Operations and <br /> Maintenance team for posting in the electrical Room. One (1) hardcopy of the <br /> report will be provided to the projects and planning department. This copy will <br /> also contain a CD which will contain the entire report in PDF format as well as <br /> the SKM project files on it. <br /> 10202 5th Avenue NE,Suite 300 I Seattle,WA 98125 I p 206.547.1940 I expect a difference I <br />
The URL can be used to link to this page
Your browser does not support the video tag.