Laserfiche WebLink
Parks Department Swim Center Page 3 of 3 <br /> Electrical Systems Upgrades and Arc Flash Breaker Coordination Study <br /> Engineering Fee Proposal <br /> • Electronic copies of the report and SKM project files will be provided to the local <br /> team as required. <br /> TASK 4 —Swim Center BAS Controls Upgrade <br /> • Design will be integrated into Task#1 drawings and specifications. <br /> ASSUMPTIONS, CLARIFICATIONS AND EXCLUSIONS: <br /> • The Owner will provide staff when opening live equipment to retrieve obscured <br /> breaker information. We shall provide a minimum of two-day notice for and <br /> electrician's assistance. <br /> SCHEDULE: <br /> The overall project schedule will be mutually worked out with the City of Everett. <br /> ELECTRICAL FEE AND EXPENSES: <br /> Base Scope of Work: <br /> Task 1. Swim Center Electrical Systems Upgrades <br /> 30% Schematic Design $ 4,000 <br /> 60% Design Development 8,000 <br /> 100% Construction Documents 10,000 <br /> Construction Administration 3,000 <br /> Sub-total 25,000 <br /> Task 2. Lighting Upgrade in Natatorium 3,000 <br /> Task 3. Arc Flash Breaker Coordination Analysis 4,500 <br /> Task 4. BAS Controls Upgrades 3,000 <br /> Expenses 250 <br /> Total $ 35,750 <br /> We propose a Time & Expense fee in the amount of $ 35,750 for this project. We propose <br /> monthly invoice based on progress. We appreciate the opportunity to submit a proposal for this <br /> project. If you have any questions regarding this proposal, please contact me and I will be <br /> happy to answer them. <br /> Sincerely, <br /> SAC <br /> Scott A. Coward <br /> Senior Project Manager—Associate Vice President <br /> (206) 547-1940 (office) <br /> (206) 550-6065 (cell) <br /> 10202 5th Avenue NE,Suite 300 I Seattle,WA 98125 I p 206.547.1940 I expect a difference I <br />