My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Resolution 6275
>
Resolutions
>
Resolution 6275
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/26/2017 9:37:13 AM
Creation date
5/26/2017 9:36:43 AM
Metadata
Fields
Template:
Resolutions
Resolution Number
6275
Date
5/26/2010
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
83
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Everett Parks and Recreation Parks <br /> EVERETT PARKS AND RECREATION <br /> CAPITAL IMPROVEMENT PLAN 2010-2015 <br /> Refit Project Type Project Priority Project Title Project Description Potential Funding Sources 2010 2011 2012 2013 2014 2015 Est Cost (6 Yr <br /> ($000) ($000) _ ($000) ($000) ($000) ($000) Plan) <br /> lc <br /> c <br /> 17 3 <br /> VI <br /> t c m W 6 YEAR PLANNING PERIOD <br /> Q m f] W u.. t9 <br /> Develop Low Develop North Everett Multi Develop a north Everett community center. X X X X $0 $0 $0 SO $0 $0 $0 <br /> Community Center Generational Community <br /> 7 Center. <br /> - <br /> Develop Medium Development Develop neighborhood park as per standards. X X X SO $0 $0 $50 $2,885 $3,082 $6,017 <br /> Neighborhood Neighborhood Parks. <br /> 8 Parks Second Phase <br /> - <br /> Develop Low Develop Downtown Park Develop downtown park. X X X X $0 $0 $0 1 $0 $0 $0 $0 <br /> Downtown Park <br /> 9 <br /> Develop Trails High Develop Trails Watershed Development of trails and recreation opportunities X X X $310 $325 $400 $300 SO $0 $1,335 <br /> Drainage Corridors Drainage Corridors on publicly owned or privately held open spaces. <br /> 10 <br /> Develop Section 8 SPA Develop Marshland Trail Develop and restore Marshland. Could include X X X $0 $0 $0 SO SO SO $0 <br /> Environmental Plan Low and Multi-use Open Space trails,multi-use fields,supporting facilities, <br /> 11 Restoration circulation and parking(Section 8 SPA Plan). <br /> Develop Medium Develop Maintenance Yard Develop maintenance yard to handle increased staff X SO $0 $125 5250 $0 $0 5375 <br /> Maintenance and equipment for new facilities.Consider efficiency <br /> Facility evaluation to determine best location and type of <br /> 12 facility. <br /> • <br /> Develop Low Develop Sievers-Deucy Develop Community Park as per masterplan. X SO $0 $0 SO SO SO $0 <br /> Community Parks Phase 3 Community Park <br /> 13 <br /> Develop Shoreline Medium Develop Section 1 Develop Section 1 Shoreline Public Access Trail. X X X X $0 $0 $0 $0 $0 $100 $100 <br /> Public Access Plan Shoreline Public Access Section 1 follows the shoreline between Mukitteo <br /> Plan and Pigeon Creek at Forest Park. Develop all <br /> weather trail on a terrace adjacent to BNSF railroad • <br /> tracks or consider elevated trail.$$$Cost to be • <br /> 14 determined per section.Includes a placeholder$55 <br /> Develop Shoreline Medium Develop Section 2 Develop Section 2 includes a Link from Pigeon X X $60 $0 $0 $200 $0 $2,000 $2,260 <br /> Public Access Plan Shoreline Public Access Creek at lower Forest Park to Everett Avenue and <br /> Plan downtown Everett.Includes an underpass or over <br /> pass at Pigeon Creek.S$$Cost to be determined <br /> 15 per section. Includes a placeholder SS$at this time. <br /> Develop Shoreline Medium Develop Section 3 Develop Section 3 encompasses the north X X X X SO $0 $0 - SO SO SO $0 <br /> Public Access Plan Shoreline Public Access waterfront from Everett Avenue to just south of the <br /> Plan "Jeld-Wen'site.Includes the 10th Street Marine <br /> Park,connection at Bayside and Grand Avenue <br /> 16 Park.$S$Cost to be determined per section. NO <br /> S$S at this time •, <br /> Develop Shoreline Low Develop Section 4 Develop Section 4 Lies at the north end of the X X X X $0 SO $0 SO SO $0 $0 <br /> Public Access Plan Shoreline Public Access Everett Peninsula.Develop a trail separated from <br /> Plan traffic along the shoreline.May require over water <br /> structures or improvement to existing road side <br /> 1 trails.$$$Cost to be determined per section.No <br /> cea vt rem lien. <br /> Page 2 C:\Documents and SettingslrhillmanlLocal Settings\Temporary Internet Files\Content.Outlook1PVNP3016\Complan CIP08 Master 3 11 08 re ' <br />
The URL can be used to link to this page
Your browser does not support the video tag.