Laserfiche WebLink
EVERETT PARKS AND RECREATION <br /> CAPITAL IMPROVEMENT PLAN 2010-2015 <br /> Ref# Project Type Project Priority Project Title Project Description Potential Funding Sources 2010 2011 2012 2013 2014 2015 Est Cost (6 Yr <br /> ($000) ($000) ($000) ($000) ($000) ($000) Plan) <br /> a <br /> c <br /> a ti <br /> ..-2 <br /> t o m W 6 YEAR PLANNING PERIOD <br /> W t7 O U 9 c <br /> ao in to U. L7 <br /> Develop Shoreline Low Develop Section 5 Develop Section 5 which ncludes the Snohomish X X X X SO SO $0 SO $0 $0 SO <br /> Public Access Plan Shoreline Public Access riverfronl between the SR 529 and 1-5 bridges. <br /> Plan Construction of a shoreline trail will require securing <br /> easements and constructing a bridge over the <br /> 18 railroad tracks.55$Cost to be determined per <br /> Develop Shoreline Medium Develop Section 6 Develop Section 6 includes the"Kimberly-Clark X X X X SO $0 $0 SO $0 SO SO <br /> Public Access Plan Shoreline Public Access Lobe and shoreline stretching to Pacific Avenue. <br /> 19 Plan 5$S Cost to be determined per section. <br /> Develop Shoreline High Develop Section 7 Develop Section 7 which includes the Snohomish X X X X $0 SO $1,000 $1,000 $1,000 $1,000 $4,000 <br /> Public Access Plan Shoreline Public Access River waterfront from Pacific Avenue to Rotary Park. <br /> Plan Improvements include establishing trails and <br /> shoreline park areas.SSS Cost to be determined per <br /> 20 section.Placeholder dollars included. <br /> Develop Shoreline Low Develop Section 8 Develop Section 8 which is at the southeast X X X X SO SO SO SO SO $0 SO <br /> Public Access Plan Shoreline Public Access terminus of Everett's shoreline. Includes Rotary <br /> Plan Park and possible improvements to the marshlands <br /> area and Lowell River Road.$SS Cost to be <br /> 21 determined per section.NO$55 at this time. <br /> Develop Shoreline Low Develop Section 9 Development of Section 9 includes Smith and X X X X $0 SO $0 SO $0 SO SO <br /> Public Access Plan Shoreline Public Access Spencer Islands.Planned trail improvements <br /> Plan Smith and Spencer include improvements to Ross Avenue,Langus <br /> Island Park Trail,providing connection to Union Slough <br /> Salt marsh and other island restoration projects.55$ <br /> 22 Cost to be determined per section.No$$$at this <br /> time <br /> Develop Trail SPA SPA Plan Project Develop Section 10 Section 10 includes three public parks and a X X X SO SO $1,000 $1,000 $1,000 $1,000 $4,000 <br /> PLAN Section 10 Shoreline Public Access connecting trail system around the lake.Develop the <br /> Medium Plan Silver Lake.Develop pedestrian trail around Silver Lake including a <br /> Silver Lake Boardwalk and boardwalk over the water on the south end. <br /> 23 Trait <br /> Develop South High Park creation with a Develop a new park that improves a major urban X X X 50 $200 $1,300 $2,000 SO SO $3,500 <br /> Everett Forest naturalistic theme. forest and includes recreational amenities as <br /> Preserve appropriate <br /> 24 <br /> Develop open High Riverfront Public Amenities Develop a 3 acre park,enhance wetlands.improve X X X X SO $5,000 55,000 $6,500 $4,400 $4,400 $25,300 <br /> space as part of and extend trails,improve creek hydrology and link <br /> the Riverfront improvements to the Lowell neighborhood. <br /> Project <br /> 25 <br /> TOTAL $441 $8,085 $9,785 $17,115 $13,045 515,052 563,523 <br /> MAJOR RENOVATION PROJECTS <br /> Major Renovation High Major Renovation Major renovation of community and neighborhood X X X X $0 $300 $715 $2,750 $2,540 $2,200 $8,505 <br /> Community Community and parks to park standards for access and recreational <br /> Neighbor Parks Neighborhood Parks opportunities. <br /> 1 <br /> Major Renovation Medium Major Renovation Forest Renovation of Forest Park and facilities to improve X X X $0 $200 SO $310 $6,000 $5,400 $11,910 <br /> District Park Park public enjoyment and use of this signature park. <br /> Project may include swimming pool renovation,trail <br /> improvements and other facilities per Master Plan. <br /> 2 <br /> Page 3 C:1Documents and Settings 1rhillmanlLocal SettingslTemporary Internet FileslContent.OutlooklPVHP30161Complan CIPOB Master 3 11 08 revised 04-08-10.XLS <br /> 79 <br />