|
16
<br /> GEHN RAL REQUIREMENTS MA SO THERMAL AND MOISTURE PROTECTION F,I�SHnrEMECHA
<br /> E. NICAL MECHANICAL
<br /> 01000 GENERAL ASSEMBLY01002 MISCELLANEOUS REQUIREMENTS D410OMORTAR 07150 DAMPPROOFING 08250 GYPSUM WALL BOARD 150M GENERAL WASHINGTON STATE ENERGY CODE:
<br /> 1.The uvf9M et as been prepared n a generic orAke farm blowing the Part 2•Pmdud Part 2•Product Pen 2-Product Pan 1-General 1.Electric water hewr(s)Mall ave a separete power or gm
<br /> 12 ,Chapter
<br /> m Fireplace and Sold Fuel Burning Appliances per I.M.C.ant Ypa g rpvoo gegen per
<br /> a -martinsetf the Co.alocoon w.Thi ds dome,
<br /> (CSI),Mebrhe I.R.C.Chapter 101: 1.T Mar'S`morbirvnh cote rat rile An t I.R.C.semon 1.PNI.R.C.wctton 5406. 1.YWh h 1. TYinate BUILDING MATERIALS"Net gra letums, 1.Mechanical°yHemtoedbkeertlegn. 2.P d.MEC, 504.4.
<br /> inknu of the Contract 1.1.0 9 Me(C This mat N k.11.idd-to work Wh a Pon 3. Net3.Exawtlan A.FMM.1. a-TYPICAL
<br /> L B BUILDING
<br /> lATERI LS'Ist to the el. 2.R Mato k bi th pravke an incompressible,heWated soba,I.a un ,.ted
<br /> maurlel selection Not tsetse he CSI brmet NO al Items are neater AIS 10mPt ch Mng appliances WIN fireplaces,
<br /> lac s,a dfim l.. atov id pts 3 W ry requ amen : mpewide,
<br /> w'°g ( ) town heateredlrepha doves factory look frtapkcea,and seplae hamc,ant ExeCWbn 1.Per I.R.C.e.Mon 5406. 2.C°Fina See Ino"f a ICAC BUILDING 7nish W LS-n son the drauirpa. A R.I.. Io Dmvot 1 General Requntm<Ms. sbach is
<br /> con eaten a water heater isEC ScIn°nun Meted O E 5 1 G BUIL D
<br /> ragpled b complete adsepeG&Within Coordinated etit ON atlorlQ•mer la i.Per I.R.C.cecoan 5601.2. A.F'vdah'.1.Coortlnata w111 mgtenae M1MM selhctbn aditlule. S.She rn Ise total maximum Btu.
<br /> mowder Bang of epees id,fl.w leclf mkt achm' A seer dab, al Mel<wmP6y wen nes shall W en I.M.C. 07190 VAPOR AND AIR RETARDER PIs aua or k sat on a,.resale floor per MEC Sec 501.21.
<br /> 'Cooranate with mataMhfinl.h eebcoon achedWe', BI MNeICMmnate. --having above hedoryhwhkhthein 04180 MASONRY ACCESSORIES 2. ,A dI. cart BOvd1.pdnthave aMmeter ma 1250 of oo[greater30 B. C.atedtu+p-1dwand fngequtpmemMal betl whened pore lostebada 3.Water heNereC tomeH a/r.(RAaw Mel be labeled
<br /> epptlanm.,ad d.bcat°d.hwalk having one howMrhsidance ramp,and Part2-Product 200.eMaemoke-developed mtlea of red greater Nen 250 per I.R.C.G 53028. ukukktlin eccaraena seller ACOA manwlJwadwr approved neatirp ant App6na Energy Conxrvetlw Au(NAECA)end be kbdad per
<br /> 2.Thee direW ngs are mpyngMed dp Design I BWd relays all right,. we,a spec°on a oke.hefween chimney orb enctoMg waft aulAd-for Pert 2-Pntluct 1.Ground aver.8 mi pdyathylerm dacK wi,17 re enum ftp. 4.Code requests arse,. P w ng akulatbn mNMdpbgk..Per M1401.3 MEC Sec.504.2.1
<br /> wwrWp and copydgm,of tits design an der to federal upyrgM W. lmmeekon and retia for ever.cldmmy.Waft Mall be Othut coatings per 1.Anchors 9ndT:Tom sono-m-resrwnt metal nes per I.R.C.motion 2,Building Wrap:see the`TYPICAL BUILDING IiATERIALS'Ikt on he A Type-X:GWBasr.quened. 3.Contractor work out pkanbhg and HVAC diagram layout. 4.Toro nlun mhrg shNibe.11.120 F.,49 C pa,WSEL
<br /> R.W.dumwna of Ilucbabns or we"drove g.m airy form h by I.M.C. R703.7 A. dawaflµ. 1.See dvklon 01002 coke.aswmby mgdremern, A Coordinate Wh phar trade. Sec.SO4.3 218 Main Street
<br /> authorambon of dip Desgn I Budd only. C)Provke Arcdockig M chancy per I.R.C.section R302.11. 2 Jolnl rainforcomered Samord Nord W.9 U.S.page w e psr I.R.C.sedbn B.WeterprooI GVA m req'd at wet or damp WW.-per I.R.C.dachon 5.new used
<br /> 0)WMHmetal fmplace Wh heats and wnounka Per manufacturers 5703.7.4./. Part3-Exenlden 570242 15400 PLUMBING B.Root/CaRrg insuleMnla confirm Yeith W6EL Sec5021.4.5:
<br /> 3.AutMrized repoduNons mud bear the name.f dp Design I Build sudfich PaR 3-Ex°°u.- 1.See Divlabn 17,Energy RegLd,. s. 5.VbMeMard or d ee,a1 d Nk balani(U.N.O.) A Bane do mahtaln 1'ae°pace above insulaan par P M B#702
<br /> E)AehOnchted Areplees,MMnsys,antl reh[m mmpansw to bear 1.Par I.R.C.Chapter 7. 8.Metal cwrer bead prone'. pan 2-Product UBC Sa.1505.3
<br /> 4.co^ao-uabnlworkng daWngagheriry marc arc aaparxnaxena caw U.L orICBO wdala landheinhaled ram INSULATION I.Coordinate wren-hese AniM°dect.sdvi ^9,: S.Both$do extark T vertical) we none dbad Kirkland, WA 98033
<br /> not purport to show-meds.-mead ofoomdoden Quesibrn pprova per manufacturers reitemr,ems. 04200 UNIT MASONRY 1.Pipe end Fite Insulation. Y° mpresse
<br /> geneoly arise to Re ardat-luel/design intent antl to mndmdlon technical 13.Flrebbddng per I.R.C.sectorn R302.11. Part 2-Product A.Waco S sad ABS plane of tiles req d for IM intended purpose. C.Ba1Rs to extend/7 vertically,above bow A/mwlatioo
<br /> Part 3-Emdahe 1.Pmvbe chat men with compression nownm hl, bawna Mawr
<br /> are.11 P wimld mew duchIm As dMdp(w,g I Bull,Miami ant rcNsigns Pan 2-Product 1.Flberglew w mineral wood WBS,boom mmard wool,and exmkm W Per
<br /> are HI part of he concbudign pouts.dP Oeerpn Buetl.herelere ahel nor be, 1.Brick masonry pdyatyre t.Appy as regWrcd hI.Q.L.CMPkr7and Tale 5702.3.5.Nasiwwrewh on pe&tOnto ,7.Wall h.ANfa to confirm wati WSEL Sete 5021.4.to 425.985.2633
<br /> Noble for any deed.intleect,or consequenal damages as a recut wn,t A EHarbr locations:rams mg. A.VAR:1.See IM-TYPICAL BUILDING MATERIALS-Bd on he dwge pea par table. 2 Aovitle dean-oWs al bends. AAI heed ban insulation to be ha copies to avoitl
<br /> participating in the construction process 01000 REGULATORY REQUIREMENTS 1.Coordida vZ.Oddels frac selection schedule. B.Celhg:1.See he"TYPICAL BUILDING MATERIALS'Ad on the dwgs. 09300 TILE B.Veto ABS -PI-
<br /> B.Meaw baton°:m m Nath C.Floor 1.See ft PICAL BUILDING MATERIALS"list on h.dwga. C.Gas.Per code,verity l..-of.ppkam.. B.Friction B unhced bane
<br /> S.Dg not very or modify the work Hawn.exupr Wh wdnen halrudbn fawn tip 1.AA oc-ctkm Mal conb,m to Me MI21Mamabwl Residential Coda i.Coordnsle wih malend fnkn sebdem scnetlWe. D.Slab on Grad°:R-10(dor W.&E.C.Table R4021.1). Pan 2-Product 1.Pfavide°n apwaved eaRnquaka MUOO valve lndalatl h Ne oWldrp 8.not used
<br /> Design I Buid.Report discrepancies erkor omkNone to the wchaed (I.R.CJ, C.Peverspenlers name/mg 2.Ineuhding loam.A Starkarel-WMd fan. 1.Canmk,quarty,and merge aka. appy,the 9.Flew Insulation b anfortn With MEC Sec.502.1.4.7:
<br /> {one"Ha y. 2012 MemMwul Binding Code(I.B.C.),2012 Intonational Fire Coda(I.F.C.), 1.cc
<br /> vkh material,rriM°election schedule. A Cowdwal,nim materials!mash oba9on schedule. tmm.d dhIY°Aar he gas metw.Tie valve Mai M loured wutake ofihe A Fowdalbn vena to be indaftd w tMi he too of the
<br /> 2012 IM instar nal Mechanical Cod.0.M.C.),2012 Uniform Pbmalg Code 2.Concrete mamdry rhea Brad.N-t CMU,umI-oIn.--indicated sizes Pert 3-Execution ctruave vets h below it.lows served o1Ne Mor Ihsulatbr,
<br /> 6.0.to he raw,of mromeenon era the budding We-the,.wit be (U,P.0 J, par&swings. 1.See dvhbn 17:energy nq.mduom s PM 3.Exeadod ant M ameuible. B.Aft and craved apace accew panel,are to M hwhim
<br /> bitlder design and ConincbJOvm,mactlen of the building podud°, M12 WeWnglon Suit°Energy Costs(W.6.E.C.)and be In accordance Oft as A,Spewl units. 1.Rafe,IB.-domiuela ncomme,kaMns. D.Mor Lae: and weather dripped to a level equivalent b the Insulation of 0e
<br /> uwnk,antl adamb8ea Time ser 0-Io p dnvhys h consideeda State L.-dies Regulators and various codes Imposed by lwkdldlen°I 1.Cowdnate,An melerkk finish eekcoon schedule. 073M ROOFING MATERIAL t.Below Grsde:11!l ypa KWNNhard ool4r surrounding surfaces per MEC Sec 502.1.4.4.
<br /> -builder wt'antl due nH indusia xg matarlak list ragulromeMe and bW autheritim. J.Gaem mason 09550 WOOD FLOORING 2.Above Gude. 10.r Moialue Comrol to conform wah WSEC Sec 502.1.8
<br /> apaciM1aOans a bu4d' ry,uMls IBkm dock)Po I.R.C.section 5670. 'Type L po K aoklha
<br /> Thostwe n k Ne Cot n-1/Owren n to vide and mord.- 2.Arrange hwedlw°Nal am mandatory de to urkdcoonal re k. A.Ekmw locations nemelmf: Pan 2-Product 2.Plumbb o wtulpment, A.Floor to nave a one dry cup of few(I.e.four mil
<br /> sunsldhty pro f gulremen B I.Shk s and roofi oke PM 2-Pntludt t.Type: A Hoi water Meer Dusk h tandem Pdy.hylau pr kofl lead maleMi)rated vapor Mme,Installed on
<br /> eucdu6orn,including product seectbn end Indafttbn w aemmbly.tip 1.Mor l-b wren mN.rlak Mash selection ad,.dd.. �° ^0 A Cgwdlnde with maleMlafinksh wkdion schedule. ( ) its warm ddo olhs InauleNon
<br /> Oesipn Baia.aawmee m fnbMy car oaponaihNey for tlkaepanciee or 01500CONSTRUCTION FACILITIESAND TEMPORARY CONTROLS B.Intmor batlons:nameRnfp: A.Sao IM"TYPICAL BUILDING MATERIALS'Nd on the&awige 1.Size per U.P.C.501 and Table S7 and)Imadmonal amentlmenta per VvSEC Sea 502.1.6.2
<br /> mnlpda=occur through ConnadorlOemer spedAetl mateakand their 1.Cowtlmale wnh rmo al,Mkh sekcown echedue. Z.Membrane nofing:A.31*hot moppets. DOM RESILIENT FLOORING 2 C.Min.le with.wart material had cOw. B.Waft to have°vapor nla,der,
<br /> cove Installation.d De ry w respombpry 1.Provide Temporary FacilMea-Including akdddy,wdtt,and temporary B.How bib,hod I Mw Mee ani° 11.Racesdud le1,114 flxture°to comply Yeah MEC Sac SD2.4.4
<br /> respe p sign BWk.,.monies no tall 2.Pr per unadbanalre Part3•Exew9on ype: C.Main shutwAvaNe ink kYw' q qu
<br /> Ise any Nems watch may be Fail sea w remned to by m...hcturw es brats i Wire..dw Pmrt 3 Execution Pad 2-Products 1.T garage. 12.S all insulation l°installed and a uhalent to me re red seal
<br /> name.hems sled out an anew lou...men.only, Z.Povltls Contemporary Controls-indudhg erosion wdl,nsM nits wnece 1.Seek and Veneer 1.hataff Far mamuratlun's recammendwon and Chapter 9 of the I.R.C. A CoordiMte wNh materials IMM selection ulmdul°. D.Plumbing fikwes 1,Coardnate wah owner mad wlsmon, R-Vibes as Mown In tables 8.1 and 62.
<br /> wd.r control and-important during construction per)uidMbn°I A Brick veneer aced be supported on lowim°,faunnfion,or other noir. O8S80 CARPETING 3.ImpHw:(bitlder design) 13.Sit(6)con deck polyethylene pound cover Mail be laid ova
<br /> 7.Do ret sale them draw for ralUchl amemabns.Ven 1 dimensions requMmeM. comic,",Supports.it MMA lure 15a left backing and No.9 07460 SIDING MATERIAL A Provide T aM.ctlon h mal.la in the ground within craw spas The polyem rd cover a to
<br /> rge y gauge,non Aange W main sMnortvaNe vdh yenepou
<br /> end datums before commencing work and be moponHble for hellacunicy. END DIVISION DIVISION conotens des at l per each 2.f.of veneer.Provide l•Kill return air epee PaAM ProducedCoordinate
<br /> 1,Canoed and Fail: separat.MWofland,Syste v( the Met ppar.tothmumwhat Na jehk and SeendimorghoW
<br /> Po kexele y. beddg. lophor g a PaR 2 req:A.d A.Coordinate nth mateMk OniM wkctlon schedule. 4.Avomatic Spnnesr System(bidder tied its of U apes to to foundation WMA per WSEC Bac.502.7.6.7
<br /> Report nclesantl/or omlWow l°Ihe amhkeU lmmedaie b°Nveen venwrand AaWdea tlMMln iMw of v°werwidr 8^)
<br /> Okklen 2 3116'min round weepholea at 33'o.c.max.,lowed immediately above he 1.nim A.Sees"the"TYPICAL BUILDING MATERMLS'ftt nI the d Wrige. 14,not used
<br /> B.The Lonacto,lO.Mttis responsible for coordinating work with s/tndesto SITE WORK ftmhg,extam Mg Rom the Me some la the eveear.Vwns rMal support no 2.Settle 6ee1M"TVPPCALICAL BUILDINGUILDING MATERIALS'Me1MIMe drawl 09900 PAINTING Pon 3•Execution 15.Service fad and uM water plphgewcondWlwed spaces MaA
<br /> nsure proper-d.dequah Imn°uof°Ilbadework,.ThemMndw Mal bad otlrar Nan as own raga andthevenicd dead eats o/venirabove. 3.Soflk9:A.Seems"TYPICAL BUILDING MATERULS'Ist on the anwhps. Part2-Products 1.Thelnwlh,b design[M ryatem to epprepriak itxindktlanelrequvemeMe be mcrlated per MEG Sec.503.11 and WAC Chapter 5158,
<br /> had
<br /> melhnNde for at re**,d misty peewors and pmudurea required to do 02200 EARTHWORK Provide angle ew support at!lopes..do-and whet pp°nmga par A.olher A.Seethe'TYPICAL BUILDING MATE RIALS'NstonhedaWrg. 1,Painting over prepared surface per manufacturers recommendation° and knction In a manner consistent wlih,II dandaka.Relay to gernFdpD DIVISION 17
<br /> this work' Pan 3.Execution R703721. Pen 3-E..A.d A Coordinate wph metwiah llnla,wlece-scwdul. moluderown. Maelan(�e Remodel
<br /> B.Par I.R.C.wdbn5703.7. 1.In"per manuhWrah rawmmendMoo and Caprer7ofthe I.R.C. 2910 16t1 I St
<br /> e.Exaq-specifiu9y defied ouene..inkrpnutbn for all tl limbene. 1.Rough patleg:wdoce AMM grading unktsdherWse spadAm. 2.Lonaata mawnryavl(CMU) 09850 WALL COVERING 15500 HVAC
<br /> �bb-mil nit,and supirwrUa al deMdlona Mal fwbw.-pool referenced 2.Finish grading:Lanticapmg tlrvlston 02800. A.Concrete m°wmy unit sea/s sal be constructed to confirm to ASTM 076W FLASHING AND SHEET METAL Pon 2-Produw Part2-Product
<br /> standards. 3.lxcdv hackling,and comuctng for atrucuwesa°needed. COO.A Mat be laid up,omfon med,end anchored a Mowon,drawings
<br /> ExedvaibnMn:,Wadding,antl comoachi for pavement a.rr°aded Pan 1.type:A caamansk Old,Cwrbadw/Ownsr matarbl selection. 1.FomsO Air Everett, Will 98201
<br /> 4.
<br /> 10.All Work Wades this corded Mal represent that of Industry wndaids,for fee 5.Hauling antl disposal of exanmel material as needed. 04400 STONE 1.Gauge gaNangad,prefiMNed. ENO DIVISION 9 A F. me system
<br /> d) '.
<br /> rew° ve trhe ades in location h ankh he pnled h bud. e.knowing of maleul e°needs. 1.Co d-m with momnals Ankh selection soheduk. WASHINGTON STATE AIR QUALITY ALT:
<br /> 7.Rock....I e°needed. Part2-Produd Part 3-Execution B.Duct wad-dimauhtlon: A.pkMto copy wah to"PrcsalptNa'ventlenon requlemems
<br /> 1.As snow i on&ava^As. 1.IndaN pea Chaplet 7 antl 9 of the I.R.C. Qivkbn 10 1.Cogrtlrnsle wah matenah An'en selection schetluk.
<br /> All refemces td the I.R.C..I.B.C.and W.S.E.0 are references 02500 PAVING AND SURFACING A.ExlMw buttons namelm C.Air dearer per the Mehi glon State Ventilation and Indoor Ak Quality Code
<br /> fB A)FksMnp,.aired a veRlul sitlewal Mal he M the step-lbusli rtMhod. SPEGNLTIES (VJ.A.Q.C.)Seaon 303.
<br /> TO 1118 2072 Code UDd B1e5. 1.Coordinate Om mabiwh finish wkmon echedJe. The Mea sial M a mhlmum of 4'd nark 4'Wde.AI tie era al its 1.Coordinate Oth me I,Mkh sNealon schedub.
<br /> Ph R 2-Prod-ed, ^g 9 B.Ah kakege wneas a e comply to b caulkSEC Sec,ale,,g.
<br /> B.Mena butlore:rnmeanlp: vasal skewaA Ns N ftMl Mal be bmm oil in a mMnsr Wl dose 102110 LOUVERS AND VENTS O'C0"�L C.The t.Was.rad,antl u B.over
<br /> c °p ng 1°t°vig°raw are r.quketl to M nuked wabd,Basketed
<br /> 01002 MISLELUNEOUS ASSEMBLY 0.EOUIREMENTS A Asphalt S,dew B.ova 3'uushmrpdf or7 ATB. 1.Cowdinsle Mh mateals MIM wkctbn ocledule. water away ban its seat ark omg tits mf pulM.Per I.R.C.5803.2.1 1.Coordinate ran matehekAnkh aekctbn adrotluk. 1. age pea WSEC Sx.5D2.4.3.a:
<br /> °Ph PSR 2-Proauctt E.Replders wM adluatada appy: erwbaihe1.EAe r;o,,Ii air leak
<br /> 1.Provke cowlsue,.rase.meknon 18'x 24'aebdrvdaa°mew B.CruoMtlrack 5/8'minus 1.EMedorjdrnts around window and door Ramea
<br /> Pon 7ExeWipn 07700 ROOFING SPECIALTIES 1.Hardvrue doth sawn l/4'x 114'm eeTl venls es detaAad. 1.Coortlirnu wdh materiae Ankh adedmn adeduk.
<br /> tlxou tMM1oor,IT,W through perimeter waft and below pnd,access C.Connate per DNlsign 3: 1,Stone V-derAelmded eaduera aitatdbn lnstrvcliorn and h 2.Cammom7 rtortnm metal mfAl veMaddet°Aed. F.Aovkk Areal t'8'veM bacon .Opanhps between seals and foundations
<br /> i.Finish 9,l,calor: per men u opP19 a per I.R.C.LR.C.sect urs R302.11. 3. betweM wails end loot ark seal k
<br /> per 1..C.wcom R408.4.Include and w.athU. ip par I.R.C.mmw accordance with I.R.C.R703.12.1 Part 2.Product 3.Rmf vets(Se Gv'relw 07700) 2.Fan:we dMebn 17 an rgy mwOmmen s, Openings pane
<br /> N110223.Abse 18'minenun you under wmtl(akk and 17 mh'anum Cmrdhete with mat°Rek Allah selection schedule. A.On Word,stud vans adhered mawnry veneer Mall be Insklewl 1.Veer: 4.Other veer a6 noted Par plena 3.Vents 4.Openings at penstraW n of utility services through waft,
<br /> tic-co deo. 2.Unn Paver:1.Cowdnate with materials AMM seketlon scMdWe. A,Ri vets:manufactured hews and rook
<br /> °pea un pi 1.Mminum d 4 inches above the myth. aA° M: 1.C--t.wpb matedeb sdM`c`w""'UM.
<br /> 2 Provide ark,.wast.mnimum 27 x Jff rhe 3P madman headroom,at 3.Pavement marltlrg:1.Coordinate with mateak fmkh cebdron sdedule. i.Cowdakt°v4h mMo el.AMM W,tww,achadWe. IOM PREFABRICATED FIREPLACES 5.Owings In the building m,,I w
<br /> M'IsMucted na 2 Minimum of t ince above paved areas,or GES 4.EM/ust Duds:
<br /> tlpe acce.dde opening per I.R.C.wdbn 5807.1.Irrwkte 3,y ft son,12 inch above 21,s ppIH nc�et welch ao B./.Coordinate
<br /> with
<br /> nualhdued by. A T-learl.outW°building end"M Oth batltdnA tlsmpen Par I.R.C.
<br /> and weaNevm Pse I.R.C.section N1 102.2.3.requirements, 02700 SEWAGE AND DRAINAGE "p°u 1.Ccordinsle Wh mateMk AMM Sebctbn Mchrtlue. Part 2-Products
<br /> atpponminat some, lorintlation 21,supports the axtaherwap. 1.LaatlwrvModeVAcoewone' wdbn,acts.3.
<br /> 3.Pnvka spat len ur 1., es lobous: PeR 2-Aotlud B.Fkahhp at burkstbn'. 2.Gult.n: 5.Dryr Duds
<br /> A)Lr0.span v°Ms.- Mhlmun tome w, .M°I be,only p an t M.f. A Conflem. cum. lad: A Coordt.wion materiae Anieh wkdion sM°tlWe.
<br /> 3(10 c.f.iartler Mor arca.Re used a i.A.
<br /> FounNge systema: i.A need rlakbor casco or Maine of•mtMmten..chm 1r car precpa Part 3.Execution A Cbhs Oryen dna he axaaktl car aaortlance rwN manuhdues
<br /> pea q panega MapM everdy pk do A.Fauktlbd spiMge!ADB perforated pipe resell-ripW. Mangy°pa inches or Plastic wMaminimum vallol avaMmaM 1.2 Sae.K."1 1.Sae dfin b 01002.8 for ml°a,.mem I f fire °rhe.Prat aI.R.C.M1502.
<br /> proved d I. ov,no on of tic to Ing,P one wde of 082. Mal he 2.b Eat-go syhemc: Mange of 31 indrea duA he inkaded 2 Calor:Math ked° g'requirements.by repuiremw s or pians. B.proterANe dveb plsisc dill be Baud per I.R.C.M1502.5.
<br /> pertniMtlto Mveo vammIu Downes per be W 5ss,Ba A Eatenorm..Ofth patty,endgame' 9.Downspouts. 2 Sad,divwon i]ear
<br /> B)Attic area or
<br /> Mhtmum net area Meer se rel lees hM 1 sf.per 150 1.Culverts
<br /> a[e wM mateak M1rdsh eelectlm schedule. END OMSION 1 A 2x3 rl.M.ulu,.loam.pocoatm. 104(q IDENTIFYING DEVICES 1. 3.Execution
<br /> .1.of an area rc i eel.per 300 cell.of attic mea If N sad 50 Alun.and not B.CWvMn' 1.Color:Match hock B W m 1.The Inwlbr n desgn me ryatem Ise appnpnate jurkarctionai r<quiremeMe STANDARD CODE NOTES
<br /> we man 80 avant,of IM rcgulrm ventneting mea k provided veMilatpn. B.Te to i tlnln PM 2l Prmuds
<br /> by 7.ain IFn WNmateahfinish edeas aehedlAe. .EIAL5 °Yatem. ammdws ndbnctbnmamanner corrhwnt wAh mduNry staMeron.Refer to general
<br /> Thew ventilators le to he lolled In ad upper porno"of..nospa
<br /> to c C.Gain PPo'.4"ADS nomurtootatl BBfa Ike. METALS 07800 SKYLIGHTS 1 AB C oogrdmeh On,con dish,fMM sekedwe schedule. oqukemeM. THIS SHEET HAS BEEN PREPARED FOR CT10N FAMILY
<br /> mqueand v and h n lead 3 kat ab"va cave r comics veins.The balance of 3. Salary sewage systems: Pan 3-Exeaaton HOUSING TYPE VNONRATE6 CONSTRUCTON
<br /> rhqund venektbn 1.the providedby eau car comke veMapar 1.R.C.wrAon A.Sewage coftction thea S'PVC wbw ahlronla nodm. 05050 METAL FASTENINGS Pan 2-prmud END DIVISION IS
<br /> RSM.2 and W.S.E.C.mquesnarls. S.Septle system:Per dnW rga of ludders designer. 1.Skylights to smarm with I.R.C.saaion R"A. 1.mall in babes per juriadictiansl requesmenk.
<br /> 4.Stops a/dedn.wake,drilewaya,eA.d.dow Wmei,and ube away Pan 3-Exacufkn Part 2-Product 2 Manufacturer.A.Coordinate wtlh matenae Ankh selection ac1+eEWe. THSI DRAVMNG IS COPYRIGHTED AND IS THE EXCLUSIVE
<br /> from building.Mhlmum l/4'per foot. 1.6ubensma 1,Bolc.Use sizes and&nae per,dwge,w as neetletl Ise Intended purposes 10800 TOILET AND BATH ACCESSORIES ONklon i6 PROPERTY OF dig dESIGN I BUILD
<br /> 5 Provide�pi numbers.ad.-m such a Posew,mo be purely A.51 b bh�n and suroum h vM dined Balls nus and wl waMen in contact On healed wood to M tic ZMAX ELETRICAL
<br /> Slope rep madenel car dNaib. WPI°Z 07900 SEALANTS AND CAULKING Part2-Products
<br /> "side and
<br /> e sire
<br /> legible Rom Il .a road frothing the propar y For I.R.C.section 2 Sunfaa dalrrape perI.R.C.wcton R401.3. (0185 ur ASTM A653)hw dlpped gaN9nded dad(ASTM 1 S3 fw Ancon). 1.Toftt ant bath accoa drin 16000 GENERAL
<br /> R319.1. OSSOD METAL FABRICATION Part 2•Produce A.Coordinate with moderiekf Mseemwn achetlula.
<br /> 8.GaragWHouse seporallon'. 02&00 SITE IMPROVEMENTS 1.Caulking A Styrene bwad°w caulking(SBR)1.Color:Match Nang Pan d-Gworml
<br /> A)Gang.codings wPositing anis aucec Mall m Prot.."with 112. part 2-product t 11900 WARDROBE AND CLOSET SPECLALTIES t.EledRal systema b M dtlder dedpnsd.
<br /> G.W.B.Kfien garages am beneath haaade rooms,the ceNtga dol M Part 2•Product 1.Herkrale and puardroft:Provide in sizes era lautbnt ec Mown per dap. END DIVISION 7 Pert 2-Produced 2.Regulet.ragWremenk:tiler b DNlsion t-Gemral RegWremant,.
<br /> wets wM 48"type Y GWS on the Barge side.Win-the m amtbn k s i.knpatlw oydem:Bitltler dealpn 3.Lmtrgcter I°
<br /> floor/chimp wau mby,the structure stop he elected efth 17 G.W.B.Par t.Lmrdhale vHh matedak Amish selection schedule. END DIVISION 5 t.Stwap,Closet provide historical diagremrtdnp Iryauta.design d,wery.I.H..
<br /> Pr DNkbluB A Coorawde wgh matMela Mkh-lection schedule. Iigang plan lfprovlded
<br /> Z.Clothes Co. A.Coordinate WN other nine.
<br /> I.R.C.to 5302.6. °nota Saha: DOORS AND WANOOWS A Coordinate with mateMhfinish wkctien schedule.
<br /> 8)Dow behveen ganga and Mune eMl he a mat doemp wNtl woad core. t.Looro'mate WN matertak flNM wlecoon schedub. DNlaion 6 18200 POWER
<br /> honeycomb core steel,or 2 Kdmae he rated door having a men
<br /> hkknsss W000 8 PLASTICS
<br /> of 1-&8"par I.R.C.section R302.5.1. 92800 UNOSCAPING 178200 MOD DOORS(Lower Level,Mein Leval,Upper Lovett 3.Pantry.
<br /> C)Duchies the garage and duds p-Mang me Wets or mdhgs depending Pad 2-Product 06100 ROUGH CARPENTRY Part 2•Product Part2-Produd
<br /> the dwaBng from tlu garage Mal be constructed of a mhbnum No.26 Bags 1.Panes wood doors: A.Coordnats WIN mateak Wnkh wkcoon ochedWe. END OMSION f 0 1,Woe ant Boxes.
<br /> ..at deet w other approved material and Mal hay°nod opwhpt Into ue Bidder Design PmR 2•Product A Vaft 12 6A J Wire
<br /> 1 R.C.R3025.2 t.Framing Lumber:Foaming lumber Mail M marked h unfwmana vAh the 2.Fbeh won doom:A Cowdinste wRh makrlala AMM sekmwn schedule ()
<br /> g°D0 Geroge
<br /> ' END DMSION 2 .Stile antl np(don door):A.Coordinate wlmateals AMM sNactbn schedule. Divkbn i1 1.GFI T Dcrp Location
<br /> D)Gaspe Mor dna dope to facilitate he mpvemem of IigWdt to a dein or Untied Stated Depr.gl Comm-,CStaMertl Rehreree No.PS 20(DOC PS 4.peep door.A.Coordinate With materials AMM selectlm emedlAe. EQUIPMENT B.Low voage:standard type
<br /> toward he males vehlok°vary doorway Per R30B.7. 20)d9ndards.Ail M dried minimum 78%. 5.Other:A.Coordinate with m°brialr:finish aeleaon echetlub. 2 Panel,:Cirwn breaker Mx Ar AY labeled
<br /> 7.Stairs di DhkbnB A.Jona-draMmlb6ant lsrger)HenFF'u a2 or loaner. 11010 MaJNTENANCE Enr _ A Ce :Bidder Design
<br /> CONCRETE _JIPMEur udy. gn
<br /> A)Mmlmum headroom Mghl B-8"per I.R.G.wmpn 5311.7.2. B.Beams end stringers',(4x arts krper)Dmp-Fe A2 w war. W300 SPECIALTY DOORS B.Lindinry.Bkder Design
<br /> 8)Minimum air bead depth l0'Wha 38'mMmun with.measured above c.Pod ata tknMn:Dose-Fkpt. 1.d 2V. Produced 3.Grounding rovide Job Number 18.009
<br /> 03100 CONCRETE FQRMWORK D.Studs.plates end mi.c.1 am Hem-Fit n w Mner. PaR 2•Product 1.V. ckaMrg system: A ROWde(1)21?echediule 80 PVC mnduW at cwrlerHa dem wet rgr
<br /> hC)To MghLMakmun be.rndgedom,endl I.R.C.maximum
<br /> ove head
<br /> pig 1"8' A.Cowdnan wah matedak fkddr selection schedule.
<br /> C)Top of Messiest sap M JI'mhhNm end 36'makmun+have tlaatl pts 3- E.'1"Jolds and Erglreeretl Mama:Per manufacturer. 1.Sliding door: etecukal mrviee arts 1 S'8'tllameder x 6P b Nanhed rod 8 Ukr
<br /> Exewtbn F.Glue lammded limber: °BN°56 () "8 g° ( File Number 16.009.CD1.1eyou!
<br /> noting and not kw Ian 1-1/7 Rom its wY.Rehm rHl antl°a wtt pr I.R.C. 1.Fgmmork ark heading for structural aN4n pets concrete sat M DY A.mgedMe and MAy,)(Ankh selection cdeduk. 4.S..for elect pounding.
<br /> wD)1 R311.7.7.1 blocking
<br /> NOcontndnr ark meat the,equaemew of he tlreWn a and Indusby 1.Simple sun'24F V4 e,24F V 2.Gaspe door.(Wri a om (me tl salon 11450) 11450 RESIDENTIAL EQUIPMENT 4.Smoke de dam:
<br /> D)Inwl he bbduhg Mtween Mlrgen m he nip ant Ootlpm of wen run g 2.Confhuow or anulever.34F VB DF/DF A.Cooldnste Wilk mHMak Mhh selecopn sdetluk.
<br /> wntlardi. G.AI oma lumber:H.m 0 Stamm w loaner. PM 2.9.stools A Provide antl nidal ptt I.R.C.wdbn 5314.
<br /> ut I.R.C.seis 5302.11. 2 AAlm 1.W ldoe be scad touchy et to ar gs Ise Blowai-plea i.GaCoo hoar Oth mat S.
<br /> Fin eenn.
<br /> E)Covey Chum.ua render airsvAh pdv de S car I.R.C.section 2302.7 concrete 1p he decetl gra adid,ubalrabi ant to allow skudurel upoon H.PywoodoMmm 'TYPICAL BUILDING
<br /> APA grcded 08600 WOOONINYL N4NDOVJS A Coordinate cabinet
<br /> materials draf M aeection schedule. A Provide and hwi Per N.E.C.and as remain W Bovemhp Are merMal.
<br /> .8..headdley Chutes8OumDwatl.r.0 Ildop•protides A.1coGVosw 28 I.Wats swathing
<br /> ..TYPICAL
<br /> ICABUILDING MATERIAL ILI on nthe dwg. Part Product 2.koninp boars,.dread Igr dawn).
<br /> Belle d-W col do IocJulolnls on°Il ouMnB°Io MaA eurtsus antl M mlf 03200 CONCRETE REINFORCING K FloorAs-1 :me"1YPICAL BUILDING MATERIALS LI6T'on lM dwq. A Coordinate aim materials MIM selection schedule.
<br /> Part 3-Evewllm
<br /> K Other As ootedm&awtn 1.Nous:Epees- 3.Free-darMi slpi system appropriate luddeicA-cmqummere°
<br /> doalrg ookd core dew,provided
<br /> B° 1. lu Idr.m to de he dem to
<br /> 8.Firedoddn Mal M lead In wooaRame mneaixhon In me fobW Part 2-Product 2.Particle Bard:A.PA.padetl a Every
<br /> g of 5.7 room Mel ave N odes one good°wvkow vaN a rel rg applirkec:
<br /> g prnv � A.Underlay [ dour opening of 5.7 sl.TM net deer wpan tie ,.hal be a mrnmun o! A Coordinate wM ma[edel,finish eekctipn echmule. am lunation h a memtt mnaldent wftA the htlWry wndena.Rekr to
<br /> lorA)1, 1. do 10,Jng deet:Delormm bar sizes and baron°per plern and deka. YnS 24',wth a Mnknum hest door widen of 20',and a findrod$R height f not mon gearal requvemen s and I.R.G.
<br /> A) r llel r oauae of bud waft antl amnorn.Inducing Arend antes Gratia 40 r I.R.C. Z1.Sham 5/S 1W(U.) ° END DIVISION 11
<br /> and penpal rosea of duds a wpperm stWe,as fapgws •4lsal Per I. tycoon 5404.7.2.2.Unkw gNenwW noted ur car 2 Shah vinyl:1K(U.N.O.)caw dNkbn 9 nun 44"above the Mor,par I.R.C.section Rif 0.
<br /> E"8Av B.Sall I.R.C.seww,it". 762110 COMMNUICATIONS
<br /> 1,H iz., l lhecettrg ark lboredong 2.Vdelded Wre fabric:HbuMns per plata ant defelk:5Y8,WI AxI.4VWvF. 3.Ubinat eurbwa 3'!(U.N.O.) cry e for er
<br /> 2. .1 irmtaAy at i^nrvak redevicemng10 fit pan 3-Exeulbn 3.Trvwe. C.See planeof/orepees and operation.bDidFURNISHINGS
<br /> 1. 2-Product
<br /> 6)At al hterconnedbrn bdweM w.uabtl venicel and hor¢ontal spaces I.AmMmun ftp for elWn stroll be 40 dkmaters taken from me emeleat 0.Rhhbnuietl corrector pble wood rmitrulkes clots tlaagnm and D.GkzI.of habeade rwoms loMamMmum ol8%of flow or..and FURNISHINGS 1.IMCoomoakrm and,m-died dershsel systenn
<br /> tuts,.°-rat sottM1e,drop coding°and cove.�ng°. be.Provide comer hers b match horizowl reinforcement.Minimum cov.nge stamped by he manutacaer in acoortlence win the'de.gn tpodfia5an for vWo3lootoM A Coordinate vi[I+materiel,finish wktlan schedule.
<br /> C)In conceeled beNveen sea siren 1 he t metal to connewd wood bueoaa'.De d,a d d%of Apse urea 5303.1 12500 WINDOW TREATMENT
<br /> sands gene op antl bosom o!tlW ur tlebift am I.R.C.aadlm 5611.7.2.2. Pia sign wigs an debift to be per 2.Pare system
<br /> run.Enclosed antes under stain shat comply With Section 8302.7. valkbid upon request. 2.wMrfadum by: Pen 2-Products A Coordinate voth material,Anih sekcown schedule.
<br /> D)At opti arse and verve.pipe.ducts ode°and sere at utlmg end 03250 CONCRETE ACCESSORIES a B.So.-Roof Framag Notes'on dr g. A.Color:I.Coordinate aim materials fired,selected ed oduk. 1.Window mecomrs.A.Cowelaurh wdh mateMk AMM selection schedule. 3.1. .-n systems'
<br /> floor level,vem and approved material b maist the Ree passage or Name ed Pan 2-Product C.Roof design,leyo.R.loading and boding Mae u by-muladuser. 8.Style:I.CooNsate Mh materials AMM show-aMedld. A Coor ,v9h materials finish mi,coaw,uhedule.
<br /> product°olmmbudiwn. t.Anger Mil.72'- ( per ) capped D.Fwd aa.rabow our rues mud w designed by manufacturer. END DIVISION 12 4.Steres
<br /> E)Fame Redwrxm f dlmne d An ,IPie zea dcho G185 ASTM A653 Mt 4.Fadenen and adMRve:At need Mei M connrtrpn vin of hzet for 48700 HARDWARE system:
<br /> g o ya an pkce.we Semon Rt IXt3.19. Balv.Mrea steel(ASTM 153 for Androfe),wlh°MnNnLIGHTIN
<br /> Vm T embetlmenl,pea A Caadnate WN mehak fink,wkcoon schedule,
<br /> F)Fkedachlrg of wmkee ofa,vpfem0y dwelNrg IsrcWired al the line of I.R.C.addition R403A.5,unem ehenshe noted an Engird- to reed prnpose pea tR.C.ode RW2.3(1).AWG timber tollsIse IIUM Pon 2-Product DNkbn 13
<br /> aweftg unit.eparanon. 2 Maden ark heams uah Srmpoo.'U"anger sone w equal to wA Mended
<br /> Ezpambnto3 Par1.0.C.wdbn5810.7. I.Type A.Coordrnta Oth matenae finish wlealon sdedde. SPECIAL CON6TRUCTON
<br /> 10.F'vedocking chap mnsiat o/he fobvnrp matenala Por I.R.C.5302.71.1. 3.Washers 3'x3'xtl4'p.Wigle Zhe 2MAX G185 ASTM A853 Mt puruw.Svnlim mnnecton at Nhtt bcatbrn as oudnm ur diaWnpa Boli 2 Weather SW A.Cowdnate Onh malmald fi-wlemon ec1--
<br /> ( Per ) Mads nuts.antl M when pea"B: Pert 2-Product
<br /> A)7 nominal lumber. sipped i.l.dill(ASTM 753 for d Phr En pee Weshersper I.R.C.wdbn par pWabn 5.M(GI$on antl ewreo h g,Thnahobe:A Cawarate with materials AniM xlemon ahetlub. 13150 POOLS 1.Fkbree 1.Goordwde vrth mheakflnish sebctbn cchedW.
<br /> B)Two hi&new of 1"mmhat lumber wM poke.Ip pian. 5602.1 i.i.Union ohafWw nolm Engineer. urea Wvtl%W(wood to (MFit Zinc d)-Wis.par ASTM A653)her
<br /> C)One Midmaw of 22/&2'woad structural oak w1N johts baled by PaR 3.Exerlabn � g dlppatl peer.heat(ASTM 153(or Fewnara),wawa hsN,BBcons brwua,of Pad 2-Products 1.Bidder design Note:A mMnsan of]5%of chi bmmanea anal he high eAklsnry per W S.E.C.
<br /> Pan 1.Anchor bola at 6d o.c.max..17 kom.omen run pew,with a mnimum 09800 GLAZING R404.1.
<br /> 23/37 woos sirucruol aloe qer ea rto.pea daps 1 Permit Submmal G5.09.16
<br /> u b W embadnsnt of T.Aevke a anNnum of balls 1 5.Pod to mat roc 13156 HOT TUBS 2.Conic:A.Soldiers 1.Cowdnate wM mNeak IINM wbdbn eMeatAe.
<br /> D)GrohitltnewofL! RideboerdWh Mshecketl 3l4" (2) urprt<secoon I.R.L. npwI.R.Clon.Pmr02.9. aunVeatedpostarea omlye schedule.Do-1,Cdondenom.1,mommal.f.-somben
<br /> ur u coon to low I P part Gawhldoemtobeddermined ewdwlWlwdh 4.Boxes:1.Coonhate with matewl.MWl selection sewdule.
<br /> paE)One,n. wdbn 540].1.8. rg our,R.C.wdbn et pro by eiz 9 Por I.R.G. PM y Protlucta
<br /> E)One til gypsum
<br /> hoes. 6,de exposed pie IamnHm wood,M raw protedea by s root or cave,mud be 2.Safety
<br /> ty iss 1.By
<br /> F)One 114'ameMbawtl mdboard. 0.l 00T _CAST IN PUCE CONCRETE pewrvatNe-treated. 2.Safey pkze per I.R.C.wdl°n 5308. A CowdnN.wah matenae!cola selection°Medde. S.glkr 1.CaMnele Oth mauneh pmts sekmon achetlub.
<br /> G)BOB.w danker wmlnsral wool or glass fiber or wMe pol-d Pan 2-Produce Part 3-Ex.culm 3.Minors to be alNared 114'Mat Plate glass. B.Aadmonal wsglo of Mt tub Moults be accounted for,design Par I.R.C. part 3-EXsateon
<br /> met enek hdalm In wM a manner as Io he wcurely rehired an plea 1053.3. 1.The arwWi to design he ryhem io approprtade luricdictlonal requesmenk
<br /> 11.Structural design alert-These notes an provided br wmemence Dory I.Sbuclual conaw:Design fc=2500 pd at 28 days.Use fc•2500 pal 1.The folowng WIa appy unw drown on drawig,.AN wootl Rsming debate END DIVISION B ant Neeson h a mamer the wM 1.he and t.j staMard.Refer to
<br /> em do not Imply that mmple,structural rely-he,bead son.on Nle mreMeIS iQ sack KI at 26 day°with it enbaidrews only for mncrdo shot M mwWded to In.mummun wndudsm the I.R.G.NI Ramhg Meq END DIVISION 13 gansral requeremerda
<br /> Muctureexposed to weather in accordance wih I.R.C.Table 5402.2.Spedal confomr b me nequelmenls of Capten 5.6.and 8 or he I.R.C.Minimum
<br /> mapectbn not required unlew norm oherWw per E,ginsat reading Mal conform tea ode 5602.3(1)oIthe I.R.C.MelpM and musing of CODE NOTES
<br /> True. 2.ArchMctural concrem.to,.*.ad aggregae fell.(waMm,to-2000 Muds Mal conform 1,bide RW2 3 of the I.R.C. CONVEYING SYSTEMS
<br /> A)op ch Ldfive l(d: 2 pat H 28 days Off 318•rwurid a h. ) �) DNklon 14
<br /> Top Mord Nva bats: 2Tod BBr°Ba
<br /> Top chord dem bad: 7ph 3.A.
<br /> ANco ch 08200 FINISH CARPENTRY
<br /> (15 pH If lis) A.AI a mate°hall have water rmudng crate u po except da bonrgs. 14100 D noduch ER
<br /> BMomcherd Nelwd 10p°fvdthout Nwnge B.Air entrelnment sheerhe S7%in atl conaele expoeedkvnetler,1.R.G Part2-product
<br /> 20Psf 9 limited dotage 2012,Table R402.2 1.Cabirmt, Part2-Product°
<br /> 30p.f ff do.ping room C.CW ngagent'. A.Cowdmcm Win material,AMM eelemon achadul°. 1.Dumhvehelc A.ManufacbreNmmel numb.,
<br /> TOTAL LOAD. 42ps1 1.Cod dinar Wm Models finish selection schedule. 2.MlAwwk and aMrp: 1.Coordinate with mateal,fnhh sekaon schedule.
<br /> or520 Pan 3-Execution A.Coortllnat°Wishmamnal,MIM selemon sohedul.. END DIVISION 14
<br /> or 62p.13.Ferment'.
<br /> B)Roof Nve load:25pd(U.N.O.) END DIVISION 3A Cliata Off,matmaterialsm
<br /> MIM swean adedule.
<br /> C)Floor live lad:40d IU
<br /> p ,N,O.I 4.Stamrdir and he" .0 by:
<br /> D)Bair and mmdor Nve bets:40 psi A.Cowdid-win ma-1,ankh°Medan schedule.
<br /> E)Mechanicalwin(U weights prorkm by manufacbrcr B.Si drvlNon Ot 002.8 Mtt.assembly requkemenls. A001
<br /> F)Meh 85 mph(U.N.O.) 5.Booao div antl loop-In MeW
<br /> mrs,:
<br /> G)Selsmk Destgn Category'D(2)(U.N.O.) A.Cowdnate Oth material.W.sekmon schedule.
<br /> H)Abwable soh pmesu'e.UMeu a was report by a qua8fim engamer 8.Plastic IM.and schd wdace-,.not
<br /> Is provided,al looting,and foundations Mat M on assumed 1 SW Pat A Cowdnate Wm materiae f'M wlacoon schedule. yam/
<br /> beaMg capacity unless Hhermse noted on dmveng. END DMSION 6 ( _{ '
<br /> J)EquvakM fluid pressure 35 pal.(D.N.O.) 1 l
<br /> 5
<br />
|