My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2906 21ST ST 2017-06-07
>
Address Records
>
21ST ST
>
2906
>
2906 21ST ST 2017-06-07
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/7/2017 11:33:52 AM
Creation date
5/31/2017 8:01:07 AM
Metadata
Fields
Template:
Address Document
Street Name
21ST ST
Street Number
2906
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
26
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Date-06 <br /> Contact 11'4Ir J4JJ4Va/✓ A CI<INI,F,y 14-ojme-- 5 l,njC <br /> Address 14f1�? 1 l-4,kcr /-2-D -601-76 O <br /> City tV,4 l a'Z7 Z <br /> Subject: Project: W u <br /> Job Address: 2jo6, •2-/41 ST <br /> Plan Check No: <br /> Dear Mt2- GuA-15olu! <br /> In response to your application for a construction permit, your plans have been examined and <br /> you are advised that the issuance of a permit is being withheld for the reasons listed below. <br /> These comments address building issues only. Additional revisions or additions may be required <br /> by other departments (such as Utilities, Planning or Fire). All references refer to the (2009 <br /> International Building Code,) (2009 International Residential Code,) as amended by the State of <br /> Washington and/or Washington State Energy Code 2006 Edition, and adopted by the City of <br /> Everett, unless stated otherwise. <br /> In order for the processing of your application to continue, it will be necessary to provide <br /> the Building Division with two new complete sets of drawings reflecting the corrections - <br /> requested. <br /> Please prepare a response letter showing where each item in this correction letter is <br /> addressed on the plan set. <br /> Upon resubmittal of the drawings, your application will be given priority and plan review will <br /> recommence. <br /> All required submittals shall be of sufficient detail and contain sufficient information to ensure <br /> that the proposed structure will be constructed in compliance with all adopted codes. <br /> Sincerely, <br /> Jeff Heilman <br /> Development Technician <br /> 425-257-8976 <br /> Email:jheilmannci.everett.wa.us <br /> kcollison/heilman/ <br />
The URL can be used to link to this page
Your browser does not support the video tag.