My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Resolution 6393
>
Resolutions
>
Resolution 6393
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/31/2017 11:27:32 AM
Creation date
5/31/2017 11:27:15 AM
Metadata
Fields
Template:
Resolutions
Resolution Number
6393
Date
6/15/2011
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
59
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY OF EVERETT <br /> 2012 To 2017 Six-year Transportation Improvement Program <br /> Interstate Local Access and Other Projects (continued) <br /> 1. I-5 /Downtown Everett Interchange Access Improvements 1. Bridge Rehabilitation Program (Maintenance) <br /> (Everett Ave.Hewitt Ave.,US 2,Pacific Ave.) 2. Annual Street Overlay Program (Maintenance) <br /> 2. I-5 / 100th Street SE HOV Access/Undercrossing 3. Sidewalk repair and replacement (Maintenance) <br /> 3. NB Everett Mall Way/ SB I-5 Onramp 4. Pavement marking projects (Maintenance) <br /> 4. I-5 / Smith Island Interchange(12th St.or SR 529) <br /> 5. I-5/East Marine View Drive Interchange Improvements 1. 106th Place SE Improvements (Street) <br /> 6. I-5 HOV Lanes (US 2 to SR 528) 2. 3rd Avenue SE Improvements (Street) <br /> 7. I-5/ 128th Street Interchange 3. Local Street Improvements (Street) <br /> 8. I-5 / 128th Street HOV Ramps (Mariner PNR) 4. Upper&Lower Ridge Rd.Improvements (Street) <br /> 9. I-5 / 112th Street Interchange Study 5. Riverfront Site Access Improvements (Street) <br /> 6. Downtown Streetscape Improvements (Street) <br /> Freeways <br /> 1. US 2 Improvements(I-5 to SR 204) 1. Traffic Signal Central Control Repl. (Traffic Signals) <br /> 2. SR 526/Hardeson Road Interchange 2. Traffic Signal Interconnect (Traffic Signals) <br /> 3. SR 526 Extension (I-5 to US 2) 3. Traffic Signal Improvements (Traffic Signals) <br /> 4. SR 526/Evergreen Way Interchange 4. Traffic Sign Improvements (Traffic Signals) <br /> 5. SR 529/Smith Island Ramps <br /> 6. SR 526/40th Avenue W.Intersection Improvements 1. Neighborhood Block Grants (Neighborhoods) <br /> 2. Neighborhood Traffic Studies/Proj. (Neighborhoods) <br /> Principal Arterials 3. Residential Sidewalks (Neighborhoods) <br /> 1. W.Marine View Dr./Rucker/41st Freight Route Improvements <br /> 2. Broadway Bridge Replacement(Bridge#529/5a) Non-Motorized Trail/Path Improvements <br /> 3. Broadway Corridor Improvements (SR 529 to SR 526) 1. Riverfront Walkway Phase II <br /> 4. SE Everett Mall Way(SR 99 to SR 526) 2. East Grand Walkway Connection <br /> 5. SR 99/Evergreen Way BRT Improvements. (128th to Pacific) 3. Henry M.Jackson Ped.Bridge <br /> 6. Arterial Safety Projects 4. 36th St. (or vicinity)/BNSF Rail Line Ped/Bike Crossing <br /> 7. Pacific Avenue/BNSF Grade Crossing Improvements 5. Smith Island Bike and Pedestrian Improvements <br /> 8. Evergreen Way Improvements (41st St.to Gibson Road) 6. Bicycle Master Plan Implementation <br /> 9. I-5 to Port of Everett Truck Route 7. Riverside Bus Pk.Ped.Trail(16th to N.Broadway) <br /> 10. Mukilteo Blvd.Safety Imp. (Friday Ave.to City Limits) 8. West/East Marine View Drive Bike-Ped Improvements <br /> 11. Arterial Needs Study 9. 47th Street Ped Improvements (Evergreen to Black Forest Lane) <br /> 10. Pigeon Creek No. 1/BNSF Rail Line Crossing <br /> Minor Arterials 11. Grand Avenue/North Marina Ped-Bike Connection <br /> 1. 112th Street SW-SE Street Improvements (I-5 to SR 527) 12. Shoreline Access Imp. (Various Locations) <br /> 2. 116th Street SE Street Improvements (SR 527 to 35th) 13. Snohomish River Bike/Pedestrian Bridge Evaluation <br /> 3. 100th Street SW Street Improv. (4th Ave.W.to Airport) 14. Pigeon Creek Rd.No. 1 Improvements <br /> 4. Casino Rd.Safety Improvements (Evergreen to 5th Ave.) 15. Everett Non-motorized Projects (Various Locations in Everett) <br /> 5. 4th Avenue West Improvements (104th to 112th) 16. Lowell Snohomish River Road.Bike/Ped Connection <br /> 6. 100th Street SE Improvements (SR 527 to 7th Ave SE) 17. Riverfront District Bike/Ped Paths <br /> 7. 100th Street SE Improvements (7th Ave to Evergreen) 18. Interurban Trail Bike/Ped Path Improvements <br /> 8. 110th Street SE Improvements(SR 527 to 35th St.) 19. Bicycle Detection Signals <br /> 9. Lenora St./Lowell-River Rd./BNSF Rail Line Oxing 20. ADA Signals <br /> 10. Minor Arterial Streetscape Improvements 21. ADA Ramps <br /> Collector Arterials Transit <br /> 1. East Everett Avenue/BNSF Overcrossing 1. Bus Replacements-2012 to 2017 <br /> 2. Bond Street Ped/Bike Improvements. (Kromer to Terminal) 2. Implementation of State CTR Law <br /> 3. Chestnut St. /Eclipse Mill Road.Improvements(Pacific to 36th) 3. SE Everett Terminal(Station) <br /> 4. Silver Lake Road-121st Street SE Ped.Improvements 4. Midtown Transit Center <br /> 5. 37th Street Improvements (Rucker to Broadway) 5. Everett Station Repair and Updates <br /> 6. Collector Arterial Streetscape Improvements 6. Base Relocation <br /> 7. Transit Voice Communications Update <br /> Local Access and Other Projects 8. Transit Priority Equipment <br /> 1. BNSF RR safety improvements (Safety) 9. Riverfront to Harborfront Connector <br /> 2. Local roadway safety projects (Safety) <br /> 3. Safe routes to schools (Safety) HOV Projects <br /> 1. Everett Station Park&Ride Parking Structure <br /> Projects in bold type not included in 2011-2016 TIP <br />
The URL can be used to link to this page
Your browser does not support the video tag.