|
CITY OF EVERETT 2012 TO 2017 SIX-YEAR TRANSPORTATION IMPROVEMENT PROGRAN
<br /> Project PROJECT PRIO- PE R/W CONST. Est.2012-17 LEAD MAP
<br /> Number TYPE RITY PROJECT NAME TERMINI START START START Expenditures AGENCY NO.
<br /> 1 Interstate 1 1-5 Downtown interchange improvements Pacific,Everett,Hewitt Ayes.,and US 2 Jan.12 Jun.13 Sep.14 28,500,000 • EVERETT 1
<br /> 2 Interstate 2 I-5/100th Street SE HOV Access/Undercrossing 1-5 at 100th Street SE Jul.13 Jan.14 Jan.15 68,500,000 • EVERETT 2
<br /> 3 Interstate 3 NB Everett Mall Way to SB 1-5 Onramp Everett Mall Way to southbound 1-5 Jan.12 May.13 3,500,000 • WSDOT 3
<br /> 4 Interstate 4 1-5/Smith Island interchange 12th Ave.NE or SR 529 Jan.12 Jun.13 Jul.14 10,000,000 • EVERETT 4_
<br /> 5 Interstate 5 1-5/East Marine View Drive Interchange 1-5 at East Marine View Drive Jan.12 Jun.13 Jun.14 16,000,000 • EVERETT 5
<br /> 6 Interstate 6 1-5 HOV Lanes US 2 to SR 528 Jan.13 Jun.17 May.19 5,000,000 • WSDOT 8
<br /> 7 Interstate 7 1-5/128th Street Interchange I-5 at 128th Street Jan.13 Jan.19 May.21 2,000,000 • WSDOT 7
<br /> 8 Interstate 8 1-5/128th Street HOV Ramps(Mariner PNR) 1-5 at 128th Street/Mariner PNR Jan.12 Jan.14 May.16 6,000,000 • WSDOT 8
<br /> 9 Interstate 9 1-5/112th Street Interchange Study 1-5 at 112th Street SE Jan.14 3,000,000 • WSDOT 9
<br /> 10 Freeway 1 US 2 Improvements 1-5 to SR 204 Jun.13 Jun.15 Jun.16 3,000,000 • WSDOT 10
<br /> 11 Freeway 2 SR 526/Hardeson Road Interchange SR 528 at Hardeson Road Jun.13 Jun.15 Jun.17 2,000,000 • WSDOT 11
<br /> 12 Freeway 3 SR 526 Extension Study SR 526 to US 2 Jun.12 8,500,000 • WSDOT 12
<br /> 13 Freeway 4 SR 526/Evergreen Way Interchange SR 526 at Evergreen Way Jun.13 Jun.15 Jun.17 38,000,000 • WSDOT 13 _
<br /> 14 Freeway 5 SR 528/40th Avenue West Intersection SR 526 and 40th Avenue West Jun.13 Jun.15 Jun.16 500,000 • EVERETT 14
<br /> 15 Freeway 6 SR 529/Smith Island Ramps SR 529 at Smith Island Jun.13 Jun.15 Jun.17 250,000 • WSDOT 15
<br /> 16 Principal Arterial 1 W.Marine View Dr./Rucker Ave./41st St.Freight Route W.Marine View Dr.,Rucker Ave,41st Street Sep.11 Jun.12 Jun.13 4,280,000 • EVERETT 16
<br /> 17 Principal Arterial 2 Broadway Bridge Replacement(#529/5a) Hewitt Ave.to California Ave. Mar.10 Jul.11 Mar.12 7,300,000 * EVERETT 17
<br /> 18 Principal Arterial 3 Broadway Corridor Improvements SR 526 to SR 529 Feb.12 Feb.13 Jun.14 4,000,000 • EVERETT 18
<br /> 19 Principal Arterial 4 SE Everett Mall Way SR 99 to SR 526 Feb.12 Feb.13 Jun.14 1,000,000 • EVERETT 19
<br /> 20 Principal Arterial 5 SR 99/Evergreen Way Bus Rapid Transit Corridor 128th Street to Everett Station May.08 Jan.09 2,150,000 • EVERETT 20
<br /> 21 Principal Arterial 6 Arterial Safety Projects(Forest Pk entrances;1-5 and Pacific) Various Locations Jan.12 Mar.13 900,000 • EVERETT
<br /> 22 Principal Arterial 7 Pacific Avenue/BNSF Grade Crossing Improvements Pacific Avenue and Chestnut St. Jan.11 Jun.12 Jun.14 6,000,000 • EVERETT 21
<br /> 23 Principal Arterial 8 Evergreen Way Improvements,41st to Airport Road 41st to Airport Road Jan.11 Jul.13 1,000,000 • EVERETT 22
<br /> 24 Principal Arterial 9 Interstate 5 to Port of Everett Truck Route Plan Port of Everett to I-5 Jan.11 200,000 • EVERETT
<br /> 25 Principal Arterial 10 Mukilteo Blvd.Safety Improvements Friday Avenue to city limits Feb.12 Apr.13 3,300,000 • EVERETT 23
<br /> 26 Principal Arterial 11 Arterial Needs Study Various arterials within city limits Feb.12 200,000 • EVERETT
<br /> 27 Minor Arterial 1 112th Street SE Improvements Interstate 5 to 19th Avenue SE Jun.07 Apr.09 Jul.10 4,650,000 • EVERETT 24
<br /> 28 Minor Arterial 2 118th Street SE Improvements SR 527 to 35th Street SE Jan.10 Jul.11 May.12 3,800,000 • EVERETT 25
<br /> 29 Minor Arterial 3 100th Street SW Improvements Airport Road to 4th Avenue West Feb.12 Jan.13 Jun.14 3,600,000 • EVERETT 26
<br /> 30 Minor Arterial 4 Casino Road at 5th Ave.W.Road Intersection Improvements Casino Road at Hardeson Road Mar.11 Mar.12 May.13 500,000 • EVERETT 27
<br /> 31 Minor Arterial 5 4th Avenue West Widening and Improvement 104th Street to 112th St.SW Jan.11 Jan.12 May.13 9,000,000 * SNO.CNTY. 28_
<br /> 32 Minor Arterial 6 100th Street SE Improvements SR 527 to 711,Avenue SE Jan.14 Jan.16 May.18 1,000,000 • EVERETT 29
<br /> 33 Minor Arterial 7 100th Street SE Improvements 7th Avenue SE to Evergreen Way Jan.14 Jan.16 May.18 1,000,000 • EVERETT 30
<br /> 34 Minor Arterial 8 110th Street SE Improvements SR 527 to 35th Street SE Jan.11 Jan.13 May.15 2,000,000 • EVERETT 31
<br /> 35 Minor Arterial 9 Lenora St./BNSF Rail Line Overcrossing Lenora St.&Lowell Sno.River Rd. Jul.11 Jul.13 May 15 1,800,000 • EVERETT 32
<br /> 36 Minor Arterial 10 Minor Arterial Expansions and Sireetscaping Various Locations Jan.12 Jan.13 May.15 400,000 • EVERETT
<br /> 37 Collector Arterial 1 East Everett Ave./BNSF Overcrossing East Grand Ave.to Railway Ave. Jan.12 Sep.13 Jun.14_ 7,000,000 • EVERETT 33
<br /> 39 Collector Arterial 2 Bond Street Ped/Bike Improvements Kromer to Terminal Ave. Jun.03 Jan.04 Jul.08 100,000 • EVERETT 34
<br /> 40 Collector Arterial 3 Chestnut St./Eclipse Mill Rd.Improvements Pacific Ave.to 36th Street Jan.10 Jun.11 3,350,000 • EVERETT 35
<br /> 41 Collector Arterial 4 Silver Lake Road-121st St.SE Ped.Improv. 112th Street to SR 527 Jun.10 Jun.11 Jul.12 1,500,000 • EVERETT 36
<br /> 44 Collector Arterial 5 37th Street improvements and traffic signal Rucker Avenue to Wetmore Ave. Jun.10 Jun.11 500,000 • EVERETT 37
<br /> 45 Collector Arterial 6 Collector Arterial Streetscape Improvements Various Locations Jan.12 Jun.13 Jul.14 400,000 • EVERETT
<br /> 265,680,000
<br /> A portion or all of the funding for this project has not yet been committed.
<br /> NOTE: Projects shown in bold type were not included in the 2011-2016 Six-Year TIP.
<br />
|