Laserfiche WebLink
• <br /> CITY OF EVERETT 2012 TO 2017 SIX-YEAR TRANSPORTATION IMPROVEMENT PROGRAM <br /> Project PROJECT PRIO- PE R/W CONST. Eat.2012-17 LEAD MAP '- <br /> Number TYPE RITY PROJECT NAME TERMINI START START START Expenditures AGENCY NO. <br /> 46 Local Access-SAF 1 BNSF RR safety Improvements Various locations Jan.12 Jun.12 600.000 • EVERETT <br /> 47 Local Access-SAF 2 Local Roadway Safety Projects Various locations Jan.12 Jun.12 120,000 • EVERETT <br /> 48 Local Access-SAF 3 Safe Routes to Schools Various locations Jan.12 Apr.10 600,000 ' EVERETT <br /> 49 Local Access-PR/M 1 Bridge Rehabilitation Program Various locations Jan.12 Jul.12 3,000,000 • EVERETT <br /> 50 Local Access-PR/M 2 Annual Street Overlay Program Various streets Jan.12 Jul.12 6,000,000 • EVERETT <br /> 51 Local Access-PR/M 3 Sidewalk repair and replacement Various locations Jan.12 May 12 360,000 • EVERETT <br /> 52 Local Access-PR/M 4 Pavement Marking Project Various locations Jan.12 May 12 210,000 • EVERETT <br /> 53 Local Access-STR 1 106th Place SE Improvements 16th Avenue SE to 19th Avenue SE Nov.10 Jun.11 650,000 • EVERETT 38 <br /> 54 Local Access-STR 2 3rd Avenue SE Street Improvements 92nd Street SE to 95th Street SE Jan.11 Apr.12 875,000 • EVERETT 39 <br /> 55 Local Access-STR 3 Local Street Improvements Various locations Jul.11 May 12 580,000 • EVERETT <br /> 56 Local Access-STR 4 Upper&Lower Ridge Rd.Slr.Improv. 74th Street to 78th Street Aug.12 Jun.13 300,000 • EVERETT 40 <br /> 57 Local Access-STR 5 Simpson Site Access Improvements Simpson Site,Snohomish Riverfront Aug.12 Jun.1 D 2,000,000 • EVERETT 41 <br /> 58 Local Access-STR 6 Downtown Streetscape Improvements Various locations in the Central Business District Jul.09 Jan.10 Apr.10 8,000,000 • EVERETT 42 <br /> 59 Local Access-SIG 1 Traffic Signal Central Controller Replacement Various locations Jan.12 Jul.12 600,000 • EVERETT <br /> 60 Local Access-SIG 2 Traffic Signal Interconnect Various locations Jan.12 May.12 240.000 • EVERETT <br /> 61 Local Access-SIG 3 Traffic Signal Improvements Various locations Jan.12 Jun.12 900,000 • EVERETT <br /> 62 Local Access-SIG 4 Traffic Sign Improvements Various locations Jan.12 Jun.12 500,000 • EVERETT <br /> 63 Local Access-NEI 1 Neighborhood Block Grants Various locations Jan.12 Mey.12 380,000 • EVERETT <br /> 64 Local Access-NEI 2 Neighb.Traffic Mitigation Studies&Projects Various locations Jan.12 May.12 2,400,000 * EVERETT <br /> 65 Local Access-NEI 3 Residential Sidewalks Various locations Jan.12 May.12 2,400,000 • EVERETT <br /> 66 Local Access-NM 1 Riverfront Walkway Phase II 41st Street to Smith Street May 08 May.12 55.000 • EVERETT 43 <br /> 67 Local Access-NM 2 East Grand Walkway Connection East Grand and 1-5 Jan.10 Jul 11 850,000 • EVERETT 44 <br /> 68 Local Access-NM 3 Henry Jackson Park Pad Bridge E.Marine View Drive to Riverside Bus.Park Jan.07 May.10 Jul.11 2,700,000 ' EVERETT 45 <br /> 69 Local Access-NM 4 38th Street/BNSF Rail Line Ped/Bike Crossing 36th&BNSF Rail Une Jan.08 Nov.08 Jun.14 2,800,000 ' EVERETT 48 <br /> 70 Local Access-NM 5 Smith Island Bike/Ped improvements Various arterials on Smith Island Jan.10 Jan.11 May 12 1,000,000 • EVERETT 47 <br /> 71 Local Access-NM 6 Bicyle Master Plan Implementation Various locations Jan.12 Aug.12 200,000 • EVERETT <br /> 72 Local Access-NM 7 Riverside Business Park Ped trail Snohomish River at Riverside Business Park Apr.09 Apr.10 700,000 • EVERETT 48 <br /> 73 Local Access-NM 8 West/East Marine View Drive Bike-Ped Improvements ANerson Bridge to North Broadway Aug.09 Apr.11 500,000 EVERETT 49 <br /> 74 Local Access-NM 9 47th Street Pedestrian Improvements Evergreen Way to Black Forest Lane Jan.11 Jun.12 500,000 ' EVERETT 50 <br /> 75 Local Access-NM 10 Pigeon Creek No.1/BNSF Crossing Port of Everett Public Access Walkway to Pigeon Crk Rd Jan.10 Jul.11 Apr.12 925,000 ' EVERETT 51 <br /> 76 Local Access-NM 11 Grand Ave/N.Marina Ped-Bike Connection Grand Ave.to W.Marine View Drive Jan.12 Jan.13 May.14 1,050,000 ' EVERETT <br /> 77 Local Access-NM 12 Shoreline Access Improvements Various locations Apr.12 Apr.13 2,400,000 ' EVERETT <br /> 78 Local Access-NM 13 Snohomish River Bike and Ped.Bridge E.Marine View Drive to Smith Island Nov.01 Apr.12 9,000,000 • EVERETT 52 <br /> 79 Local Access-NM 14 Pigeon Creek Road No.1 Improvements Muki88o Bbd to BNSF RAN Apr.12 Apr.14 1,000,000 • EVERETT 53 <br /> 80 Local Access-NM 15 Lowes Snohomish River Rd.Bike/Ped Connection Rotary Park to city knits May.11 Aug.12 Sep.13 1,500,000 • EVERETT 54 <br /> 81 Local Access-NM 16 Everett Non-Motorized Projects•• Various locations May.12 Aug.10 Sep.11 760,000 • EVERETT <br /> 82 Local Access-NM 17 Riverfront District Bike/Ped Paths Various locations in Riverfront District Jul.09 Jul.11 500,000 • EVERETT <br /> 83 Local Access-NM 18 Interurban Trail Bike/Ped Path Improvements Various locations on Interurban Trail Jul.10 Jul.12 500,000• EVERETT <br /> 84 Local Access-NM 19 Bicyle Detection Signals Various locations Jan.12 Jul.12 200,000• EVERETT <br /> 85 Local Access-NM 20 ADA Signals Various locations Jan.12 Jul.12 200,000' EVERETT <br /> 86 Local Access-NM 21 ADA Ramps Various locations Jan.12 Jul.12 200,000• EVERETT <br /> "Candidate non-motorized improvements include Norton Avenue,Olympic Drive,Smith Avenue,Wall Street, 58,035,782 <br /> Lowell River Road,36th Street,Sharon Drive,Friday Avenue,Lowell Road-Lenora Street,Both Street SW, <br /> 93rd Street SW,Dorn Avenue-92nd Street SE,7th Avenue SE,3rd Avenue SE,Dakota Way,Hollowdale Place.Cady Road, <br /> Fleming Street,75th Street,100th Street SW,and Shore Avenue/Edgewater Beach and various shoreline public access projects <br /> •A portion or all of the funding for this project has not yet been committed. NOTE: Projects shown in bold type were not included in the 2011-2016 Six-year TIP. <br /> Local Access Codes: SAF=Safety; PR/M=Preservation and Maintenance; STR=Street construction; SIG=Traffic Signal Improvement; <br /> NEI=Neighborhood Projects; LS=Landscaping Project; NM=Non-Motorized Improvement <br />