My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Reece Construction Company Inc. 5/24/2017
>
Contracts
>
Capital Contract
>
Reece Construction Company Inc. 5/24/2017
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/5/2017 10:39:05 AM
Creation date
6/5/2017 10:37:28 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Reece Construction Company Inc.
Approval Date
5/24/2017
Council Approval Date
5/3/2017
Department
Public Works
Department Project Manager
Richard Hefti
Subject / Project Title
Water Main Replacement R UP3646
Public Works WO Number
UP3646
Tracking Number
0000659
Total Compensation
$1,382,407.59
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
332
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY OF EVERETT SPECIAL PROVISIONS <br /> TABLE OF CONTENTS <br /> ADVERTISEMENT FOR BIDS 1 <br /> DIVISION B - BID ITEM DESCRIPTIONS 3 <br /> DIVISION P - PROPOSAL 13 <br /> CONTRACT 25 <br /> DIVISION 1 — GENERAL REQUIREMENTS 33 <br /> General Description and Location of Project (******) 33 <br /> Design Engineer (******) 33 <br /> Standard Specifications (******) 33 <br /> 1-01 DEFINITIONS AND TERMS 34 <br /> 1-01.3 Definitions 34 <br /> 1-02 BID PROCEDURES AND CONDITIONS 38 <br /> 1-02.1 Prequalifications of Bidders 38 <br /> 1-02.1 Bidder Responsibility Criteria (******) 38 <br /> 1-02.2 Plans and Specifications 38 <br /> 1-02.4 Examination of Plans, Specifications, and Site of Work 39 <br /> 1-02.5 Proposal Form 40 <br /> 1-02.6 Preparation of Proposal 40 <br /> 1-02.7 Bid Deposit 41 <br /> 1-02.8 Noncollusion Declaration and Lobbying Certification 41 <br /> 1-02.9 Delivery of Proposal 41 <br /> 1-02.10 Withdrawaling, Revising, or Supplementing Proposal 41 <br /> 1-02.12 Public Opening of Proposals 42 <br /> 1-02.13 Irregular Proposals 42 <br /> 1-02.14 Disqualification of Bidders 43 <br /> 1-02.15 Pre-Award Information 43 <br /> 1-03 AWARD AND EXECUTION OF CONTRACT 43 <br /> 1-03.1 Consideration of Bids 43 <br /> 1-03.2 Award of Contract 44 <br /> 1-03.3 Execution of Contract 44 <br /> 1-03.4 Contract Bond 45 <br /> 1-03.5 Failure to Execute Contract 45 <br /> 1-03.6 Return of Bid Deposit 45 <br /> 1-03.7 Judicial Review 45 <br /> 1-04 SCOPE OF THE WORK 46 <br /> 1-04.1 Intent of the Contract 46 <br /> 1-04.2 Coordination of Contract Documents, Plans, Special Provisions Specifications, and Addenda 47 <br /> 1-04.3 Reference Information 47 <br /> 1-04.4 Changes 47 <br /> 1-04.4 Changes 47 <br /> Watermain Replacement"R" Table of Contents - March 1, 2017 <br /> WO No.— UP3646 SP -i <br />
The URL can be used to link to this page
Your browser does not support the video tag.