My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Reece Construction Company Inc. 5/24/2017
>
Contracts
>
Capital Contract
>
Reece Construction Company Inc. 5/24/2017
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/5/2017 10:39:05 AM
Creation date
6/5/2017 10:37:28 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Reece Construction Company Inc.
Approval Date
5/24/2017
Council Approval Date
5/3/2017
Department
Public Works
Department Project Manager
Richard Hefti
Subject / Project Title
Water Main Replacement R UP3646
Public Works WO Number
UP3646
Tracking Number
0000659
Total Compensation
$1,382,407.59
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
332
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY OF EVERETT SPECIAL PROVISIONS <br /> 1-04.5 Procedure and Protest by the Contractor 49 <br /> 1-04.5 Notice by Contractor (******) 49 <br /> 1-04.6 Variation in Estimated Quantities 51 <br /> 1-04.7 Differing Site Conditions (Changed Conditions) 51 <br /> 1-05 CONTROL OF WORK 51 <br /> 1-05.1 Authority of the Engineer 51 <br /> 1-05.1 City (******) 52 <br /> 1-05.2 Authority of Assistants and Inspectors 52 <br /> 1-05.2 City's Representative (******) 52 <br /> 1-05.3 Working Drawings 53 <br /> 1-05.4 Conformity With and Deviations From Plans and Stakes 55 <br /> 1-05.6 Inspection of Work and Materials 56 <br /> 1-05.7 Removal of Defective and Unauthorized Work 57 <br /> 1-05.10 Guarantees 58 <br /> 1-05.11 Final Inspection 59 <br /> 1-05.11 Final Inspections and Operational Testing (******) 59 <br /> 1-05.12 Final Acceptance 60 <br /> 1-05.13 Superintendents, Labor and Equipment of Contractor 61 <br /> 1-05.14 Cooperation With Other Contractors 61 <br /> 1-05.16 Water and Power (******) 62 <br /> 1-05.17 Oral Agreements (******) 62 <br /> 1-05.18 Contractor (******) 62 <br /> 1-05.19 City-Contractor Coordination (******) 65 <br /> 1-06 CONTROL OF MATERIAL 66 <br /> 1-06.1 Approval of Materials Prior to Use 66 <br /> 1-06.2 Acceptance of Materials 67 <br /> 1-06.3 Manufacturer's Certificate of Compliance 67 <br /> 1-06.4 Handling and Storing Materials 67 <br /> 1-06,6 Recycled Materials 68 <br /> 1-07 LEGAL RELATIONS AND RESPONSIBILITIES TO THE PUBLIC 68 <br /> 1-07.1 Laws to be Observed RR <br /> 1-07.2 State Sales Tax 69 <br /> 1-07.5 Environmental Regulations 70 <br /> 1-07.6 Permits and Licenses 70 <br /> 1-07.9 Wages 71 <br /> 1-07.11 Requirements for Nondiscrimination 72 <br /> 1-07.14 Responsibility for Damage 73 <br /> 1-07.17 Utilities and Similar Facilities 75 <br /> 1-07.18 Public Liability and Property Damage Insurance 77 <br /> 1-07.18 Insurance (******) 77 <br /> 1-07.20 Patented Devices, Materials, and Processes 81 <br /> 1-07.23 Public Convenience and Safety 81 <br /> 1-07.24 Rights of Way 82 <br /> 1-07.27 No Waiver of State's Legal Rights 83 <br /> Watermain Replacement"R" Table of Contents - March 1, 2017 <br /> WO No.-UP3646 SP -ii <br />
The URL can be used to link to this page
Your browser does not support the video tag.