Laserfiche WebLink
1 COE_INTRO-2012.RTF <br /> 2 <br /> 3 INTRODUCTION TO THE SPECIAL PROVISIONS <br /> 4 <br /> 5 (August 14, 2013 APWA GSP) <br /> 6 <br /> 7 The work on this project shall be accomplished in accordance with the Standard <br /> 8 Specifications for Road, Bridge and Municipal Construction, 2016 edition, as issued <br /> 9 by the Washington State Department of Transportation (WSDOT) and the American <br /> 10 Public Works Association (APWA), Washington State Chapter (hereafter "Standard <br /> 11 Specifications"). The Standard Specifications, as modified or supplemented by the <br /> 12 Amendments to the Standard Specifications and these Special Provisions, all of <br /> 13 which are made a part of the Contract Documents, shall govern all of the Work. <br /> 14 <br /> 15 These Special Provisions are made up of both General Special Provisions (GSPs) <br /> 16 from various sources, which may have project-specific fill-ins; and project-specific <br /> 17 Special Provisions. Each Provision either supplements, modifies, or replaces the <br /> 18 comparable Standard Specification, or is a new Provision. The deletion, <br /> 19 amendment, alteration, or addition to any subsection or portion of the Standard <br /> 20 Specifications is meant to pertain only to that particular portion of the section, and in <br /> 21 no way should it be interpreted that the balance of the section does not apply. <br /> 22 <br /> 23 The project-specific Special Provisions are not labeled as such. The GSPs are <br /> 24 labeled under the headers of each GSP, with the effective date of the GSP and its <br /> 25 source. For example: <br /> 26 <br /> 27 (March 8, 2013 APWA GSP) <br /> 28 (April 1, 2013 WSDOT GSP) <br /> 29 (May 1, 2013 $$2$$ GSP) <br /> 30 <br /> 31 <br /> 32 Also incorporated into the Contract Documents by reference are: <br /> 33 • Manual on Uniform Traffic Control Devices for Streets and Highways, <br /> 34 currently adopted edition, with Washington State modifications, if any <br /> 35 • Standard Plans for Road, Bridge and Municipal Construction, <br /> 36 WSDOT/APWA, current edition <br /> 37 • City of Everett Design and Construction Standards and Specifications for <br /> 38 Development <br /> 39 <br /> 40 Contractor shall obtain copies of these publications, at Contractor's own expense. <br /> 41 <br /> 42 <br /> 43 DIVISIONI.GR1 <br /> 44 Division 1 <br /> 45 General Requirements <br /> 46 <br /> HOT MIX ASPHALT OVERLAY 2017 MARCH 2017 <br /> 1 <br />