My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Granite Construction Company 5/24/2017
>
Contracts
>
Capital Contract
>
Granite Construction Company 5/24/2017
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/6/2017 10:26:42 AM
Creation date
6/5/2017 11:29:42 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Granite Construction Company
Approval Date
5/24/2017
Council Approval Date
5/10/2017
Department
Public Works
Department Project Manager
Narci Ricafrente
Subject / Project Title
Hot Mix Asphalt Overlay 2017 Project
Public Works WO Number
PW3642
Tracking Number
0000660
Total Compensation
$3,938,398.65
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Granite Construction Company 9/29/2017 Amendment 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
214
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1 DESWORK.GR1 <br /> 2 DESCRIPTION OF WORK <br /> 3 <br /> 4 FDESWORKI.DOCX <br /> 5 (March 13, 1995) <br /> 6 This Contract provides for the improvement of ***The construction of 23,673 tons <br /> 7 of Hot Mix Asphalt, Class % inch, PG 64-22, two inch (2") thick, on selected <br /> 8 City Streets, including grinding, utility adjustments, such as manhole, catch <br /> 9 basin, inlet, valve box, monument case and cover, striping, channelization, <br /> 10 traffic induction loops *** and other work, all in accordance with the attached <br /> 11 Contract Plans, these Contract Provisions, and the Standard Specifications. <br /> 12 <br /> 13 1-01.3.RTF <br /> 14 1-01.3 Definitions <br /> 15 (January 4, 2016 APWA GSP) <br /> 16 <br /> 17 Delete the heading Completion Dates and the three paragraphs that follow it, and <br /> 18 replace them with the following: <br /> 19 <br /> 20 Dates <br /> 21 Bid Opening Date <br /> 22 The date on which the Contracting Agency publicly opens and reads the <br /> 23 Bids. <br /> 24 Award Date <br /> 25 The date of the formal decision of the Contracting Agency to accept the <br /> 26 lowest responsible and responsive Bidder for the Work. <br /> 27 Contract Execution Date <br /> 28 The date the Contracting Agency officially binds the Agency to the Contract. <br /> 29 Notice to Proceed Date <br /> 30 The date stated in the Notice to Proceed on which the Contract time begins. <br /> 31 Substantial Completion Date <br /> 32 The day the Engineer determines the Contracting Agency has full and <br /> 33 unrestricted use and benefit of the facilities, both from the operational and <br /> 34 safety standpoint, any remaining traffic disruptions will be rare and brief, and <br /> 35 only minor incidental work, replacement of temporary substitute facilities, <br /> 36 plant establishment periods, or correction or repair remains for the Physical <br /> 37 Completion of the total Contract. <br /> 38 Physical Completion Date <br /> 39 The day all of the Work is physically completed on the project. All <br /> 40 documentation required by the Contract and required by law does not <br /> 41 necessarily need to be furnished by the Contractor by this date. <br /> 42 Completion Date <br /> 43 The day all the Work specified in the Contract is completed and all the <br /> 44 obligations of the Contractor under the contract are fulfilled by the <br /> 45 Contractor. All documentation required by the Contract and required by law <br /> 46 must be furnished by the Contractor before establishment of this date. <br /> HOT MIX ASPHALT OVERLAY 2017 MARCH 2017 <br /> 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.