My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Granite Construction Company 5/24/2017
>
Contracts
>
Capital Contract
>
Granite Construction Company 5/24/2017
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/6/2017 10:26:42 AM
Creation date
6/5/2017 11:29:42 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Granite Construction Company
Approval Date
5/24/2017
Council Approval Date
5/10/2017
Department
Public Works
Department Project Manager
Narci Ricafrente
Subject / Project Title
Hot Mix Asphalt Overlay 2017 Project
Public Works WO Number
PW3642
Tracking Number
0000660
Total Compensation
$3,938,398.65
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Granite Construction Company 9/29/2017 Amendment 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
214
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1 2. Be signed by an approved surety (or sureties) that: <br /> 2 a. Is registered with the Washington State Insurance Commissioner, and <br /> 3 b. Appears on the current Authorized Insurance List in the State of <br /> 4 Washington published by the Office of the Insurance Commissioner, <br /> 5 3. Guarantee that the Contractor will perform and comply with all obligations, <br /> 6 duties, and conditions under the Contract, including but not limited to the <br /> 7 duty and obligation to indemnify, defend, and protect the Contracting Agency <br /> 8 against all losses and claims related directly or indirectly from any failure: <br /> 9 a. Of the Contractor (or any of the employees, subcontractors, or lower tier <br /> 10 subcontractors of the Contractor) to faithfully perform and comply with all <br /> 11 contract obligations, conditions, and duties, or <br /> 12 b. Of the Contractor (or the subcontractors or lower tier subcontractors of <br /> 13 the Contractor) to pay all laborers, mechanics, subcontractors, lower tier <br /> 14 subcontractors, material person, or any other person who provides <br /> 15 supplies or provisions for carrying out the work; <br /> 16 4. Be conditioned upon the payment of taxes, increases, and penalties incurred <br /> 17 on the project under titles 50, 51, and 82 RCW; and <br /> 18 5. Be accompanied by a power of attorney for the Surety's officer empowered <br /> 19 to sign the bond; and <br /> 20 6. Be signed by an officer of the Contractor empowered to sign official <br /> 21 statements (sole proprietor or partner). If the Contractor is a corporation, the <br /> 22 bond(s) must be signed by the president or vice president, unless <br /> 23 accompanied by written proof of the authority of the individual signing the <br /> 24 bond(s) to bind the corporation (i.e., corporate resolution, power of attorney, <br /> 25 or a letter to such effect signed by the president or vice president). <br /> 26 <br /> 27 <br /> 28 <br /> 29 <br /> 30 1-04.2.RTF <br /> 31 1-04.2 Coordination of Contract Documents, Plans, Special Provisions, <br /> 32 Specifications, and Addenda <br /> 33 (March 13, 2012 APWA GSP) <br /> 34 <br /> 35 Revise the second paragraph to read: <br /> 36 <br /> 37 Any inconsistency in the parts of the contract shall be resolved by following this <br /> 38 order of precedence (e.g., 1 presiding over 2, 2 over 3, 3 over 4, and so forth): <br /> 39 1. Addenda, <br /> 40 2. Proposal Form, <br /> 41 3. Special Provisions, <br /> 42 4. Contract Plans, <br /> 43 5. Amendments to the Standard Specifications, <br /> 44 6. Standard Specifications, <br /> 45 7. Contracting Agency's Standard Plans or Details (if any), and <br /> 46 8. WSDOT Standard Plans for Road, Bridge, and Municipal Construction. <br /> HOT MIX ASPHALT OVERLAY 2017 MARCH 2017 <br /> 11 <br />
The URL can be used to link to this page
Your browser does not support the video tag.