My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Granite Construction Company 5/24/2017
>
Contracts
>
Capital Contract
>
Granite Construction Company 5/24/2017
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/6/2017 10:26:42 AM
Creation date
6/5/2017 11:29:42 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Granite Construction Company
Approval Date
5/24/2017
Council Approval Date
5/10/2017
Department
Public Works
Department Project Manager
Narci Ricafrente
Subject / Project Title
Hot Mix Asphalt Overlay 2017 Project
Public Works WO Number
PW3642
Tracking Number
0000660
Total Compensation
$3,938,398.65
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Granite Construction Company 9/29/2017 Amendment 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
214
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY OF EVERETT, WASHINGTON <br /> SPECIAL PROVISIONS <br /> TABLE OF CONTENTS FOR <br /> HOT MIX ASPHALT OVERLAY 2017 <br /> 1 W.O. # PW 3642 <br /> 1 <br /> DIVISION 2 <br /> EARTHWORKS <br /> 2-02 REMOVAL OF STRUCTURES AND OBSTRUCTION <br /> 2-02.4 Measurement SP 2-1 <br /> 2-02.5 Payment SP 2-1 <br /> I <br /> 2-04 HAUL <br /> 2-04.1 Description SP 2-1 <br /> 1 2-04.3 Construction Requirements SP 2-1 <br /> 2-04.4 Measurements SP 2-1 <br /> 1 2-04.5 Payment SP 2-1 <br /> 2-07 WATERING <br /> 2-07.8 Street Cleaning (New Section) SP 2-1 <br /> 2-07.8(1) Description SP 2-1 <br /> 2-07.8(2) Construction Requirements SP 2-1 <br /> 2-07.8(3) Measurement SP 2-1 <br /> 1 2-07.8(4) Payment SP 2-2 <br /> 1 <br /> ,i DIVISION 5 <br /> SURFACE TREATMENTS AND PAVEMENTS <br /> 5-04 HOT MIX ASPHALT <br /> 5-04.3(8)A General SP 5-1 <br /> 5-04.3(14) Planing Bituminous Pavement SP 5-1 <br /> HOT MIX ASPHALT OVERLAY 2017 MARCH 2017 <br /> Work Order#PW 3642 <br /> Table of Contents <br /> I <br />
The URL can be used to link to this page
Your browser does not support the video tag.