Laserfiche WebLink
5-04.4.3(18)HMA Night Paving SP 5-2 <br /> 5-04.4 Measurement SP 5-3 <br /> 5-04.5 Payment SP 5-3 <br /> 1 <br /> DIVISION 7 <br /> DRAINAGE STRUCTURES, STORMS SEWER, SANITARY SEWER, WATER MAINS AND <br /> CONDUITS <br /> 7-05 MANHOLES,INLETS,AND CATCH BASINS <br /> ' 7-05.3 Construction Requirements q ents .SP 7— <br /> 1 <br /> 7-05.3(1) Adjusting Manholes and Catch Basins to Grade SP 7— 1 <br /> 7-05.4 Measurement SP 7—2 <br /> 7-05.5 Payment SP 7 - 2 <br /> I <br /> DIVISION 8 <br /> MISCELLANEOUS CONSTRUCTION <br /> 8-09 RAISE PAVEMENT MARKERS <br /> 8-09.1 Description SP 8— 1 <br /> 8-09.2 Materials SP 8— 1 <br /> 8-09.3 Construction Requirements SP 8 — 1 <br /> 8-09.3(5) Asphalt Adhesives .SP 8 -- 1 <br /> 8-09.4 Measurement .. SP 8 -- 1 <br /> 1 8-09.5 Payment .SP 8 - 1 <br /> 8-13 MONUMENTA <br /> C SES <br /> 1 8-13.1 Description SP 8—2 <br /> 8-13.3 Construction Requirements SP 8—2 <br /> 8-13.3(3) Adjust Existing Monument Casings to Grade SP 8—2 <br /> 8-13.4 Measurement SP 8—2 <br /> 8-13.5 Payment SP 8 -2 <br /> 8-14 CEMENT CONCRETE SIDEWALKS <br /> 1 8-14.3 Construction Requirements SP 8-2 <br /> 8-14.3(1) Excavation SP 8-3 <br /> HOT MIX ASPHALT OVERLAY 2017 MARCH 2017 <br /> Work Order#PW 3642 <br /> Table of Contents <br /> I <br />