Faber Construction Corporation 5/15/2017 Change Order 2
>
Contracts
>
Capital Contract
>
Faber Construction Corporation 5/15/2017 Change Order 2
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/7/2017 11:58:55 AM
Creation date
6/7/2017 11:58:53 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Faber Construction Corporation
Approval Date
5/15/2017
Department
Public Works
Department Project Manager
Richard Hefti
Subject / Project Title
Water Main Q Broadway
Public Works WO Number
UP3612
Amendment/Change Order
Change Order
Amendment/Change Order Number
2
Tracking Number
0000297
Total Compensation
$0.00
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Faber Construction Corp 9/27/2016
(Amendment)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
i <br /> a <br /> Project: Water Main Replacement"Q" <br /> Change Order No.: 2 <br /> Change Order Effective Date: 04-21-2017 <br /> I <br /> 1. Everett Municipal Code 3.80.050 sets forth the threshold amounts below which the <br /> Mayor or his designee is authorized to direct Contractor to perform additional work.In <br /> calculating such threshold amounts,Washington State sales tax, if applicable to the <br /> Work,has been considered. <br /> 2. The duration of the Contract shall be adjusted to the extent described in this Change <br /> Order. 1 <br /> 3. Contractor waives and releases any and all claims arising out of,or related to, this <br /> Change Order,the work described in Exhibit A,and all work and actual or constructive <br /> changes that occurred or began prior to the date of this Change Order,including, but = <br /> not limited to,claims for equitable adjustment of time and compensation,delay,impact, <br /> overhead,or inefficiencies. This provision does not apply to requests for equitable <br /> adjustment of time or price for which the Contractor timely and properly provided <br /> notice of a differing site condition, protest,dispute,claim or Contract Claim as required <br /> by the Contract Documents. If the Contract Documents establish a time period for i <br /> notice of a differing site condition, protest,dispute, claim,or Contract Claim that ends I <br /> after the date of this Change Order,but relates to work performed prior to the date of <br /> this Change Order,then this provision does not apply if the Contractor timely and <br /> properly submits such notice <br /> 4. This Change Order only changes the contract between Contractor and City to the <br /> extent explicitly provided herein. <br /> r <br /> CITY <br /> Attest: Approved As to Form: <br /> F <br /> I/ ‘ Nbi, _„,a i <br /> Skir41"°".e. -A -Ali 0", ,. ___ ...—.--...imei 4. <br /> Ma1 <br /> City Clerk City Attorney I <br /> Date: 5.44-2017. Date: 5-/S?O/)-- s ate: __/ • _ <br /> Recommended By: <br /> Construction Project Engineer (if Engineering Department Director <br /> Manager(if applicable) Manager(if <br /> applicable) ..plicable <br /> / /// hO 1 <br /> C.-) 7,f.tei- riapl,,,,. , ia,li , A.A_A_4 r' 1 <br /> Date: Date. Inini D ,t e: 51-.. 77Da e.' a <br /> 1 <br /> 1 <br /> f <br /> i <br /> i <br /> Page 2 of 3 . <br />