My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Faber Construction Corporation 5/15/2017 Change Order 2
>
Contracts
>
Capital Contract
>
Faber Construction Corporation 5/15/2017 Change Order 2
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/7/2017 11:58:55 AM
Creation date
6/7/2017 11:58:53 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Faber Construction Corporation
Approval Date
5/15/2017
Department
Public Works
Department Project Manager
Richard Hefti
Subject / Project Title
Water Main Q Broadway
Public Works WO Number
UP3612
Amendment/Change Order
Change Order
Amendment/Change Order Number
2
Tracking Number
0000297
Total Compensation
$0.00
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Faber Construction Corp 9/27/2016
(Amendment)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Project: Water Main Replacement"Q" <br /> Change Order No.: 2 <br /> Change Order Effective Date: 04-21-2017 <br /> CONTRACTOR <br /> By �' Date: ,51/// 7 <br /> Officer <br /> Arre, NwwS ` G <br /> Exhibit A—Description of Changed Work <br /> Change Order No. 1 Modifies one(1)bid item in the contract as stated below: <br /> Bid Item 35-Replace Water Meter Box,3/4 Inch. Modify bid item 35 entitled, "Replace Water Meter <br /> Box,3/4 Inch" at the contract unit price of$414.86 per each, by adding 18 each to the contract, for an <br /> increase to the contract in the amount of$7,467.48. <br /> Exhibit B—Justification: <br /> Bid Item 35-Replace Water Meter Box,3/4 Inch. The bid item for Replace Water Meter Box 3/4 Inch <br /> over ran the estimated amount in the contract and, as a result additional funds are needed to complete <br /> the project. <br /> Exhibit C—Additional Contract Time: <br /> No contact time is required due to these changes. ? "^ <br /> F• <br /> Page 3 of 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.