Laserfiche WebLink
.A, .. <br /> Residential Photovoltaic OTC Permit Application <br /> Contractors can apply for an Over-The-Counter(OTC)permit where the PV system meets the requirements listed <br /> in this Checklist.All project plans and supporting documentation must be provided on site for the Inspector. <br /> ---TO BE COMPLETED BY APPLICANT---- <br /> Project information <br /> Property Owner Name: Robert Pierre <br /> Project Address: 8016 Beverly Blvd Parcel# <br /> City: Everett State: WA ZIP: 98203 <br /> Day Phone: 206-767-9999 <br /> Contractor Name Sunergy Systems <br /> Contractor License#: SUNERSi905D4 <br /> contractor Day Phone: 206-297-0086 <br /> PVsystern description ROOF MOUNTED PHOTOVOLTAIC, GRID TIE ONLY, N <br /> (Include manufacturer BATTERIES. ALL LISTED EQUIPMENT, RAPID <br /> and model#of PV SHUTDOWN COMPLIANT. <br /> modules and <br /> inverters): <br /> Q)Deten-(A-1e if VgLIi'13rOjed qualifies for expedited poi- pitting: <br /> Yes No <br /> 1. PV system Is designed and proposed for a detached one-or two-family dwelling or <br /> townhouse not more than three stories above grade or detached accessory structure that <br /> is code compliant to setbacks and height,or code allows expansion of nonconformity for <br /> solar modules. [IRC 101.21 <br /> 2. Modules on pitched roofs do not exceed the highest point of the roof unless approved by lv( 0 <br /> the local jurisdiction. <br /> 3. Rooftop is made from Ilghtwelght material such'as a single layer of composition shingles, td ❑ <br /> metal roofing,lightweight masonry,or cedar shingles. <br /> 4. The Installation shall comply with the manufacturer's Instructions.[IRC M2302.21 El <br /> 5. The installation shall meet the requirements of NFPA 70 National Electric Code,and all <br /> required electrical permit(s)must be obtained from the Authority Having Jurisdiction to ❑ <br /> administer the electrical code.[IRC M2302.2] <br /> 6. The Installation shall meet the requirements of the International Fire Code as amended ❑ <br /> by WA State.[IRC M2302.21 <br /> 7. The PV system is designed for the wind speed of the local area,and will be Installed per �. Q <br /> the manufacturer's specifications. [IRC M2302,2.1(1)) <br /> & The ground snow load does not exceed 70 pounds per square foot. [IRC M2302,2.1(2)] 5r ❑ <br /> 9. Total dead load of modules,supports,mountings,raceways and all other appurtenances <br /> weigh no more than-four pounds per-square foot.[IRC M2302.2.1(3)] ❑ <br /> Enter total dead load of system(lbs/ftz): 3 <br /> 10. To address uplift,modules are mounted no higher than 18"above the surface of the M, ❑ <br /> roofing to which they are affixed. [IRC M2302.2.1(4)] <br /> 1 ' <br />