Laserfiche WebLink
8. Detail 2/4 on Sheet 10 should be revised to show the bottom of the handrail sloping <br /> continuously 11" past the last nosing (not leveling off). <br /> 9. The door exiting storage room No. 2 requires 18" of maneuverability clearance on the <br /> latch side per ANSI A117.1 Section 404.2.3. <br /> 10. The restroom will be required to comply with ANSI A117.1, Section 603. To prevent <br /> field issues, it is recommended that you include detailing which includes: grab bar <br /> dimensions; vertical grab bar; toilet height; toilet location; sink height; dispenser <br /> location; etc. <br /> 11. The plans should include the requirement for a fan in the restroom. <br /> If you have any questions, please call me at 425-257-7264. <br /> Please prepare a response letter showing where each item in this correction letter is addressed <br /> on the plan set. <br /> Upon resubmittal of the drawings, your application will be given priority and plan review will <br /> recommence. <br /> All required submittals shall be of sufficient detail and contain sufficient information to ensure <br /> that the proposed structure will be constructed in compliance with all adopted codes. <br /> Sincerely, <br /> Steve Miller <br /> Associate Engineer <br /> S:\]Common\Clerical\SMiller\B1302-015(8220 Beverly Blvd).doc <br />