Laserfiche WebLink
Parking garages shall use the letter"P"to designate floors. <br /> When there is only one parking level at or above grade, it shall be marked with the letter"P". When <br /> there is more than one parking level at or above grade,they shall be marked with the letter"P" <br /> followed by numbers, in ascending order. Example—"P1" "P2", etc. <br /> When there is only one parking level below grade, it shall be marked"P01". When there is more <br /> than one parking level below grade,they shall be marked with the letter "P"followed by numbers, in <br /> descending order. Example—"P01", "P02", etc. <br /> Large parking structures may use letters to designate columns for ease of locating automobiles. <br /> Example—"Floor P3, Column E". <br /> 16. All fire alarm control panels (FRCP) and sprinkler valves shall be in heated rooms or closets with <br /> standard man door access. Locations shall be approved by the Fire Code Official(NFPA 13 <br /> 8.16.4.1.3). <br /> 17. The location of Fire Department connections (FDC)and post indicator valves (PIV) shall be <br /> determined by the Fire Code Official. If immediate outside man door access is available to the <br /> sprinkler valves (risers), a PIV will not be required. <br /> The FDC shall be located at the street near the fire hydrant. <br /> 18. Trash Collection-Dumpsters over 1.5 cubic yards capacity shall be located a minimum of 5 feet <br /> from the building(IFC 304.3.3 and 304.3.4, 2012 Edition). <br /> 19, Fire apparatus roads shall have a minimum unobstructed width of 26 feet in the immediate vicinity of <br /> any building or portion of building more than 30 feet in height. At least one of the required access <br /> routes shall be located within a minimum of 15 feet and a maximum of 30 feet from the <br /> building and shall be positioned parallel to one entire side of the building. See 2012 IFC, <br /> Appendix D, D 105.3. <br /> Electric gates must have a Knox key override. <br /> 20, A building footprint and lot layout for this project shall be provided to the Fire Marshal's Office on <br /> CD/DVD. <br /> GENERAL INFORMATION <br /> 1. Puget Sound Energy is the natural gas provider in this area. To initiate new service orders,please <br /> contact PSE at least 90 days prior to the required in-service date. Any relocation of existing gas <br /> facilities for this development will be at the developer's sole expense, and requires 90 days minimum <br /> notice. <br /> 2. The Snohomish County PUD currently has sufficient capacity to serve the proposed development. <br /> However,the existing District facilities in the local area may require upgrading. Cost of any work, <br />